APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Item<br />
No.<br />
1.1<br />
1.2<br />
1.3<br />
1.4<br />
(i)<br />
(ii)<br />
(iii)<br />
Descriptions<br />
CHAPTER-1<br />
CARRIAGE OF MATERIALS<br />
Summary <strong>of</strong> Rate Analysis<br />
Loading <strong>and</strong> unloading <strong>of</strong> stone boulder / stone aggregates / s<strong>and</strong> / kanker /<br />
moorum. (Placing tipper at loading point, loading with front end loader, dumping,<br />
turning <strong>for</strong> return trip, excluding time <strong>for</strong> haulage <strong>and</strong> return trip)<br />
Loading <strong>and</strong> Unloading <strong>of</strong> Boulders by Manual Means<br />
Loading <strong>and</strong> Unloading <strong>of</strong> Cement or Steel by Manual Means <strong>and</strong> stacking.<br />
Cost <strong>of</strong> Haulage Excluding Loading <strong>and</strong> Unloading<br />
Surfaced <strong>Road</strong><br />
Unsurfaced Gravelled <strong>Road</strong><br />
19<br />
Katcha Track <strong>and</strong> Track in river bed / nallah bed <strong>and</strong> choe bed.<br />
Unit Rate<br />
cum 112.00<br />
cum 103.00<br />
tonne 123.00<br />
tonne.km 4.20<br />
tonne.km 5.10<br />
tonne.km 10.20