11.04.2013 Views

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Preamble:<br />

CHAPTER - 1<br />

CARRIAGE OF MATERIALS<br />

1 The rate analysis <strong>of</strong> loading <strong>and</strong> unloading <strong>of</strong> various items include stacking.<br />

18<br />

2 2 The rate analysis <strong>for</strong> loading <strong>and</strong> unloading has been given both by manual <strong>and</strong> mechanical<br />

means. Means <strong>of</strong> loading/unloading appropriate to the work <strong>and</strong> site is to be adopted.<br />

3 The rate analysis <strong>for</strong> haulage <strong>of</strong> materials has been made in terms <strong>of</strong> tonne-kilometre (t.km)<br />

<strong>for</strong> ease <strong>of</strong> adoption depending upon the lead in km <strong>and</strong> load in tonnes.<br />

4 The cost <strong>of</strong> carriage will vary depending upon the riding surface <strong>of</strong> the road. Provision has<br />

accordingly been made considering surfaced roads, unsurfaced gravel roads <strong>and</strong> katcha<br />

tracks.<br />

5 Analysis <strong>for</strong> carriage <strong>of</strong> materials is exclusive <strong>of</strong> the loading, unloading <strong>and</strong> stacking <strong>and</strong> this<br />

has to be added as applicable.<br />

6 Carriage <strong>of</strong> materials if done by boats shall be paid at the same rates as given <strong>for</strong> carriage <strong>of</strong><br />

materials by road.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!