11.04.2013 Views

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

APPWD Schedule of Rates for Road and Bridges - Arunachalpwd.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

13<br />

Items No. Summary <strong>of</strong> <strong>Rates</strong> calculated <strong>and</strong> used <strong>for</strong> analysis <strong>of</strong> rates <strong>of</strong> other items<br />

Unit Rate<br />

Item 8.3 Printing new letter <strong>and</strong> figures <strong>of</strong> any shade (ii) English Roman<br />

per cm height<br />

per letter<br />

0.30<br />

Item 8.8 Painting Two Coats on New Concrete Surfaces<br />

sqm 44.00<br />

Item 8.9 Painting angle iron post two coats<br />

sqm 39.00<br />

Item 12.6 (B) Cement mortor 1:2 (Excluding OH & CP)<br />

cum 4,555.00<br />

Item 12.6 (A) Cement mortor 1:3 (Excluding OH & CP)<br />

cum 3,632.00<br />

Item 12.6 (D) Cement mortor 1:6 (Excluding OH & CP)<br />

cum 2,363.00<br />

Item 12.7 (A ) Course Rubble masonary in cement mortor 1:3 (including OH & CP)<br />

cum 2,766.00<br />

Item 12.7 (Addl) B) R<strong>and</strong>om Rubble masonary in cement mortor 1:6 (including OH & CP)<br />

cum 2,222.00<br />

Item 12.8 (A) PCC Grade M15 including OH & CP <strong>for</strong> Open Foundation by Mixer<br />

cum 3,906.00<br />

Item 12.8 (A) PCC Grade M15 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer<br />

cum 2,846.00<br />

Item 12.8 (B) PCC PCC Grade M20 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer<br />

cum 3,293.00<br />

Item 12.8 (C) RCC Grade M20 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer<br />

cum 3,471.00<br />

Item 12.8 (C) RCC RCC Grade M20 including OH & CP <strong>for</strong> Open Foundation by Batching Plant<br />

cum 4,691.00<br />

Item 12.8 (C) RCC Grade M20 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Batching Plant<br />

cum 3,417.00<br />

Item 12.8 (D) PCC Grade M25 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer<br />

cum 3,626.00<br />

Item 12.8 (D) PCC Grade M25 including OH & CP <strong>for</strong> Open Foundation by Batching Plant<br />

cum 4,895.00<br />

Item 12.8 (D) PCC Grade M25 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Batching Plant<br />

cum 3,575.00<br />

Item 12.8 (E) RCC Grade M25 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer<br />

cum 3,808.00<br />

Item 12.8 (E) RCC Grade M25 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Batching Plant<br />

cum 3,827.00<br />

Item 12.8 (F) PCC Grade M30 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer<br />

cum 3,662.00<br />

Item 12.8 (F) PCC Grade M30 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Batching Plant<br />

cum 3,607.00<br />

Item 12.8 (G) RCC Grade M30 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer<br />

cum 3,828.00<br />

Item 12.8 (G) RCC Grade M30 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Batching Plant<br />

cum 3,776.00<br />

Item 12.8 (H) RCC Grade M35 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer<br />

cum 3,921.00<br />

Item 12.8 (H) RCC Grade M35 including OH & CP <strong>for</strong> Open Foundation by Batching Plant<br />

cum 4,062.00<br />

Item 12.8 (H) RCC Grade M35 excluding OH & CP <strong>for</strong> Open Foundation by Batching Plant<br />

cum 5,361.00<br />

Item 12.8 (H) RCC Grade M35 <strong>for</strong> Open Foundation Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Batching Plant<br />

cum 3,944.00<br />

Item 12.11 (C) i PCC Grade M20 <strong>for</strong> Open Foundation (Bottom Plug) Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer cum 3,634.00<br />

Item 12.11 (C) i<br />

PCC Grade M20 <strong>for</strong> Open Foundation (Bottom Plug) Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by<br />

Batching Plant<br />

cum 3,611.00<br />

Item 12.11 (C) ii PCC Grade M25 <strong>for</strong> Open Foundation (Bottom Plug) Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer cum 3,820.00<br />

Item 12.11 (C) ii<br />

PCC Grade M25 <strong>for</strong> Open Foundation (Bottom Plug) Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by<br />

Batching Plant<br />

cum 3,794.00<br />

Item 12.11 (C) iii PCC Grade M30 <strong>for</strong> Open Foundation (Bottom Plug) Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer cum 3,856.00<br />

Item 12.11 (C) iii<br />

PCC Grade M30 <strong>for</strong> Open Foundation (Bottom Plug) Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by<br />

Batching Plant<br />

cum 3,832.00<br />

Item 12.11 (C) iv PCC Grade M35 <strong>for</strong> Open Foundation (Bottom Plug) Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by Mixer cum 3,940.00<br />

Item 12.11 (C) iv PCC Grade M35 including OH & CP <strong>for</strong> Well Foundation (Bottom Plug) by Batching Plant<br />

cum 5,405.00<br />

Item 12.11 (C) iv<br />

PCC Grade M35 <strong>for</strong> Open Foundation (Bottom Plug) Per Cum Basic Cost <strong>of</strong> Labour, Material & Mechinery by<br />

Batching Plant<br />

cum 3,915.00<br />

Item 12.11 (F) iv PCC Grade M35 including OH & CP <strong>for</strong> Well Foundation (Well Cap) by Batching Plant<br />

cum 5,258.00<br />

Item No. 3.13 Excavation <strong>for</strong> Structures (Manual Means)<br />

cum 102.00<br />

Item No. 3.13 Excavation <strong>for</strong> Structures (Mechenical Meanse)<br />

cum 35.00<br />

Item 14.1(A) RCC Grade M20 <strong>for</strong> super-structure including OH & CP by Batching Plant<br />

cum 5,354.00<br />

Item 14.1(B) RCC Grade M20 <strong>for</strong> super-structure including OH & CP by Batching Plant<br />

cum 5,913.00<br />

Item 14.1(E) RCC Grade M20 <strong>for</strong> super-structure including OH & CP by Batching Plant<br />

cum 6,349.41<br />

Item 14.1(C) RCC Grade M30 <strong>for</strong> super-structure including <strong>for</strong>mwork <strong>and</strong> excluding OH & CP by Batching Plant<br />

cum 4,533.00<br />

Item 14.1(C) RCC Grade M30 <strong>for</strong> super-structure excluding <strong>for</strong>mwork <strong>and</strong> excluding OH & CP by Batching Plant<br />

cum 3,778.00<br />

Item 14.2 A Supplying ,fitting <strong>and</strong> placing HYSD bar rein<strong>for</strong>cement in super-structure exncluding OH & CP<br />

tonne 36,859.00<br />

Item 13.6 Supplying, fitting <strong>and</strong> placing HYSD including OH & CP <strong>for</strong> sub-structure<br />

tonne 48,091.00<br />

Item 5.17 Fog Seal<br />

sqm 30.00<br />

Item 5.21 Case-I Crack Prevention courses. Case-I Stress Absorbing Membrane (SAM) crack width less than 6 mm<br />

sqm 54.00<br />

Item 5.21 Case-II Crack Prevention courses. Case-II Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm<br />

sqm 60.00<br />

Item 5.21 Case-IV<br />

Crack Prevention courses. Case-III Stress Absorbing Membrane (SAM) crack width above 9 mm <strong>and</strong> cracked area<br />

above 50 %<br />

sqm 78.00<br />

Item 5.21 Case-IV Crack Prevention courses. Case-IV Bitumen Impregnated Geotextile<br />

sqm 65.00<br />

Item 5.15 Case-I Slurry Seal Case-I 5 mm thickness<br />

sqm 49.00<br />

Item 5.15 Case-II Slurry Seal Case-II 3 mm thickness<br />

sqm 34.00<br />

Item 5.15 Case-III Slurry Seal Case III 1.5 mm thickness<br />

sqm 21.00<br />

Item 5.9 Case-I Surface Dressing Case-I 19 mm nominal chipping size<br />

sqm 56.00<br />

Item 5.9 Case-II Surface Dressing Case-II 13 mm nominal size chipping<br />

sqm 50.00

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!