10.04.2013 Views

Ashwin Ghatalia Director of Productivity & Infrastructure ... - Sematech

Ashwin Ghatalia Director of Productivity & Infrastructure ... - Sematech

Ashwin Ghatalia Director of Productivity & Infrastructure ... - Sematech

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Global Economic Workshop<br />

Summary <strong>of</strong> Previous Workshop<br />

<strong>Ashwin</strong> <strong>Ghatalia</strong><br />

<strong>Director</strong> <strong>of</strong> <strong>Productivity</strong> & <strong>Infrastructure</strong><br />

May 14, 1999


History <strong>of</strong> Industry Economic Forums<br />

• I300I and Selete Supplier Workshops 1997-1998<br />

• SEMI / I300I 300mm Forum June 1998<br />

• I300I / Supplier Executive Forums July 1998<br />

• ISMT / SEMI-SMT Economics Workshop October 1998<br />

• ISMT Board Dinner w/ Global Suppliers November 1998<br />

• Selete Supplier Workshop December 1998<br />

• ISMT Global Economics Workshop May 1999<br />

SEMI-SMT = SEMI/SEMATECH<br />

ISMT = International SEMATECH<br />

5/25/99 11:02 AM j:\stndpres\template\IntST.ppt - 2


Summary <strong>of</strong> Previous Workshop<br />

• Low revenue and growth for semiconductor<br />

industry in 1998<br />

– 300 mm timing gated by economics<br />

– Specific new capacity timing is variable<br />

– New capacity most likely needed in 2001-2002<br />

– Strong impact on R&D due to reduced revenue<br />

– R&D spending priority acceleration or 300 mm<br />

• ‘97 NTRS too slow for leading edge companies<br />

– 300 mm introduction will occur in multiple design rule<br />

• 250-130nm<br />

5/25/99 11:02 AM j:\stndpres\template\IntST.ppt - 3


Action Items<br />

• Processed wafer support for suppliers <br />

• Newsletter <br />

• Continuing dialogue<br />

– Present meeting <br />

– Future meetings <br />

• Clear definition from IC manufacturing on timing <strong>of</strong><br />

equipment testing for 300 mm R&D, pilot, and<br />

production<br />

• Test beds for automation and communication<br />

standards <br />

• Automation features and pay back - factory modeling <br />

5/25/99 11:02 AM j:\stndpres\template\IntST.ppt - 4


Previous Workshop Output<br />

Areas <strong>of</strong> Discussion<br />

• What are the triggers for 300 mm transition?<br />

• How to leverage existing R&D going forward?<br />

5/25/99 11:02 AM j:\stndpres\template\IntST.ppt - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!