Section V: Mitigation Strategy<br />

• Public Works Division, Jalna has specified that they would require the following<br />

material for construction of temporary shelters in the case of <strong>disaster</strong> situation. The<br />

detailed estimate is as follows:<br />

Name of work – Construction of Huts or temporary shelters in crisis situation.<br />

Sr.<br />

No.<br />

A B S T R A C T<br />

Item of Work Quantity Rate Unit Amount<br />

01 Providing and fixing 6.00<br />

mm. Thick GI Sheet<br />

corrugated (big size) sheet<br />

roofing including<br />

galvanised iron J or L<br />

Hook bolts and nuts and<br />

bolts and nuts and<br />

scaffolding comp. (D.S.R.<br />

297 P. No. 62)<br />

02 Supplying wooden ballies<br />

etc.<br />

108.00 299.00 Sq.m. 32292.00<br />

360.00 25.00 Rmt. 09000.00<br />

03 Supplying nut and bolts 160.00 34.00 Kg. 5440.00<br />

04 Providing Ballies 80.00 30.00 Kg. 2400.00<br />

05 Providing murum flooring<br />

with adding 70mm. Thick<br />

murum, washing with<br />

cowdung, etc complete.<br />

108.00 17.00 Sq.m. 1836.00<br />

Total Rs. ------- 50,968.00<br />

Add 5% for Contingency ----- 02,548.00<br />

Net Amount --------- 53,516.00<br />

Jalna District Disaster Response Plan Vol II - 19