6 Tribunals Rs. 200,000 1 x 1 4 Tribunals 800 880 968 1,065 1,171 4,884 Sub Total 800 880 968 1,065 1,171 4,884 7 District <strong>Court</strong>s Rs. 300,000 x 1 x 1 75 <strong>Court</strong>s 22,500 24,750 27,225 29,948 32,942 137,365 Sub Total 22,500 24,750 27,225 29,948 32,942 137,365 8 Judgment Execution Directorate Rs. 4,000,000 x 1 x 1 1 2,000 4,000 4,400 4,840 5,324 20,564 Sub Total 2,000 4,000 4,400 4,840 5,324 20,564 g Equipments (All <strong>Court</strong>s ) i Computer with Printers Rs. 100,000 x 1 x 440 Pcs. x 1 44,000 48,400 53,240 58,564 64,420 268,624 ii Laptop Rs. 100,000 x 1 x 100 Pcs. x 1 10,000 11,000 12,100 13,310 14,641 61,051 iii LCD Projector Rs. 100,000 x 1 x 10 Pcs. x 1 1,000 1,100 1,210 1,331 1,464 6,105 iv Fax Rs. 25,000 x 1 x 20 Pcs. x 1 500 550 605 666 732 3,053 vi Photocopy Machine Rs. 175,000 x 1 x 15 Pcs. x 1 2,625 2,888 3,176 3,494 3,843 16,026 vii Camracorder (DVD) Rs. 70,000 x 1 x 2 Pcs. x 1 140 154 169 186 205 855 ix Networking (with sever) Rs. 2,000,000 x 1 x 1 Pcs. x 1 2,000 2,200 2,420 2,662 2,928 12,210 x CC Camera with system Rs. 100,000 x 1 System x 75 Pcs. x 1 7,500 8,250 9,075 9,983 10,981 45,788 xi Hand held Metal Detector Rs. 15,000 x 1 x 20 Pcs. x 1 300 330 363 399 439 1,832 xii EPABX Appellate <strong>Court</strong> Rs. 200,000 x 1 x 2 Pcs. x 1 400 440 484 532 586 2,442 xiii EPABX District <strong>Court</strong>s Rs. 200,000 x 1 x 1 Pcs. x 5 <strong>Court</strong>s 1,000 1,100 1,210 1,331 1,464 6,105 xiv EPABX Other <strong>Court</strong>s Rs. 200,000 x 1 x 1 Pcs. x 1 <strong>Court</strong> 200 220 242 266 293 1,221 xv Air Conditioner <strong>Supreme</strong> <strong>Court</strong> Rs. 150,000 x 1 x 2 Pcs. x 1 300 330 363 399 439 1,832 xvi Air Conditioner Appellate <strong>Court</strong>s Rs. 150,000 x 1 x 2 Pcs. x 16 <strong>Court</strong>s 4,800 5,280 5,808 6,389 7,028 29,304 xvii Air Conditioner District <strong>Court</strong>s Rs. 150,000 x 1 x 2 Pcs. x 30 <strong>Court</strong>s 9,000 9,900 10,890 11,979 13,177 54,946 xviii Solar Panel Appellate <strong>Court</strong>s Rs. 150,000 x 1 x 5 Pcs. x 1 <strong>Court</strong> 750 825 1,575 xxi Solar Panel District <strong>Court</strong>s Rs. 150,000 x 1 x 3 Pcs. x 16 <strong>Court</strong>s 7,200 7,920 15,120 xxii Euro Guard Rs. 50,000 x 1 x 40 Pcs. x 1 2,000 2,200 2,420 2,662 2,928 12,210 xxiii Power Back Up Generator Rs. 1,000,000 x 1 x 10 Pcs. x 1 10,000 11,000 12,100 13,310 14,641 61,051 xxiv Time Punch In /Out Machine Rs. 60,000 x 1 x 20 Pcs. x 1 1,200 1,320 1,452 1,597 1,757 7,326 xxv Magnimeter (Walk through Gate) Rs. 200,000 x 1 x 2 Pcs. x 1 400 440 484 532 586 2,442 xxvi Fluoroscope (X-ray machine) Rs. 7,000,000 x 1 x 1 Pcs. x 1 7,000 7,700 8,470 9,317 10,249 42,736 xxvii Duress Alarm System Rs. 75,000 x 1 x 20 Pcs. x 1 1,500 1,650 1,815 1,997 2,196 9,158 xxviii Milking System Rs. 50,000 x 1 x 2 Pcs. x 1 100 110 121 133 146 611 xxix Fire Exitingtinguiser System Rs. 10,000 x 1 x 280 Pcs. x 1 2,800 3,080 3,388 3,727 4,099 17,094 xxx Fire Alarm System (Panel Sensor) Rs. 500,000 x 1 x 20 Pcs. x 1 10,000 11,000 12,100 13,310 14,641 61,051 xxxi Earthquake Battery Operated Stand Alone Rs. 10,000 x 1 x 18 Pcs. x 1 180 198 218 240 264 1,099 xxxii Access Control System Rs. 75,000 x 1 x 5 Pcs. x 1 375 413 454 499 549 2,289 Sub Total 127,270 139,997 144,377 158,815 174,696 745,156 153 4.3 To manage the financial resources a To constitute high level policy formulation committee regarding budget incl. logistic for judiciary i Committee Expenses Rs. 75,000 x 3 Meeting x 1 x 1 Committee 225 248 272 299 329 1,374 Sub Total 225 248 272 299 329 1,374
To constitute Plan Formulation and Budget Management Committee for coordination and management of budget i Committee Expenses Rs. 25,000 x 6 Meetings x 1 x 1 Committee 150 165 182 200 220 916 Sub Total 150 165 182 200 220 916 c To hold interaction with parliamentary committee and stakeholders for financial effectiveness i Interaction among the Stakeholders Rs. 75,000 x 3 Times x 1 x 1 225 248 272 299 329 1,374 Sub Total 225 248 272 299 329 1,374 d To establish High Level Judicial Budget Disbursement - i Committee Expenses Rs. 75,000 x 4 Meetings x 1 x 1 300 330 363 399 439 1,832 Sub Total 300 330 363 399 439 1,832 e To formulate financial standards - i Working Group Rs. 15,000 x 15 Days x 1 Committee x 1 225 248 272 299 329 1,374 ii Report Rs. 15,000 x 1 Time x 1 x 1 15 17 18 20 22 92 Sub Total 240 264 290 319 351 1,465 4.4 To strengthen library system a To conduct need assessment and status of library of all courts i Experts Rs. 30,000 x 1 Month x 1 No. x 1 30 30 ii Researcher Rs. 25,000 x 1 Month x 1 No. x 1 25 25 iii Transportation for Expert and Researcher Rs. 7,500 x 2 Ways x 2 Nos. x 5 Places 150 150 iv Daily Allowances (Field Visit) Rs. 2,500 x 7 Days x 2 Nos. x 5 Places 175 175 v Report Preparation Rs. 15,000 x 1 Time x 1 x 1 15 15 154 Sub Total 395 395 b To review and implement policy on library i Working Group Rs. 75,000 x 1 Month x 1 Committee x 1 75 75 ii Report Rs. 15,000 x 1 Time x 1 x 1 15 15 Sub Total 90 90 c To conduct study for establishment of regional libraries in Biratnagar, <strong>Nepal</strong>gunj and Pokhara i Taskforce (including field visits Rs. 100,000 x 1 Month x 1 Committee x 1 100 100 ii Report Rs. 15,000 x 1 Time x 1 x 1 15 15 115 115 Rs. 10,000,000 x 1 Library x 3 Regions x 1 Yearly 30,000 33,000 63,000 d To establish regional libraries in Biratnagar, <strong>Nepal</strong>gunj and Pokhara Sub Total 30,000 33,000 63,000 e To improve libraries of all courts Rs. 250,000 x 20 Library x 1 x 1 Yearly 5,000 5,500 6,050 6,655 7,321 30,526 Sub Total 5,000 5,500 6,050 6,655 7,321 30,526 f Selection and purchase of books Rs. 125,000 x 99 Library x 1 x 1 Yearly 12,375 13,613 14,974 16,471 18,118 75,551 Sub Total 12,375 13,613 14,974 16,471 18,118 75,551 g To purchase and establish Lexis Nexis in <strong>Supreme</strong> <strong>Court</strong> Rs. 1,500,000 x 1 <strong>Court</strong> x 1 x 1 Yearly 1,500 1,650 1,815 1,997 2,196 9,158 Sub Total 1,500 1,650 1,815 1,997 2,196 9,158
- Page 1 and 2:
Second Five-Year Strategic Plan of
- Page 4 and 5:
Supreme Court Full Court Under the
- Page 6 and 7:
Introduction The process of planned
- Page 8 and 9:
Drafting of Plan in itself is not a
- Page 10 and 11:
Executive Summary 1.1 Preliminary W
- Page 12 and 13:
During the Plan period, although sa
- Page 14 and 15:
thereof. In the process of managing
- Page 16 and 17:
provided to court users. Similarly,
- Page 18 and 19:
Table of Contents Page Decision of
- Page 20:
Chapter One Introduction 1
- Page 23 and 24:
listing achievements obtained from
- Page 25 and 26:
During the discussions organized be
- Page 27 and 28:
Plan and accordingly shall maintain
- Page 30 and 31:
Chapter Two Vision, Mission and Val
- Page 32:
Chapter Three Review of the First P
- Page 35 and 36:
3.2.1.2 Issue appropriate orders fo
- Page 37 and 38:
During the first year of the Plan,
- Page 39 and 40:
disposal rate has been satisfactory
- Page 41 and 42:
TABLE: 9 Statement of Execution of
- Page 43 and 44:
Although, the strategic plan with j
- Page 45 and 46:
functions and duties of the judicia
- Page 47 and 48:
courts were not in accordance with
- Page 49 and 50:
Activities carried out to fulfill t
- Page 51 and 52:
Pursuant to the policy of providing
- Page 53 and 54:
een provided for outstanding court
- Page 55 and 56:
3.3.10 To strengthen the investigat
- Page 57 and 58:
Accordingly a Committee 76 headed b
- Page 59 and 60:
and data retrieval has been introdu
- Page 61 and 62:
In order to effectively implement t
- Page 64:
Chapter IV Situation Analysis 45
- Page 67 and 68:
Particulars TABLE: 15 Case Disposal
- Page 69 and 70:
yearly arrears is satisfactory, the
- Page 71 and 72:
Currently under the various levels
- Page 73 and 74:
eap benefits for the organization a
- Page 75 and 76:
Furniture and other Equipments Curr
- Page 77 and 78:
The demonstrations made in the cour
- Page 79 and 80:
Although, the judiciary is directly
- Page 81 and 82:
egularly updated; area of mediation
- Page 83 and 84:
facilities provided to summon execu
- Page 85 and 86:
• Reform activities to be conduct
- Page 87 and 88:
under the courts. While doing so, s
- Page 90 and 91:
Chapter Five Core Functions Pursuan
- Page 92:
Chapter Six Projection of Strategic
- Page 95 and 96:
6.2 To maximize the use of informat
- Page 97 and 98:
Chapter Seven Risks and Mitigating
- Page 99 and 100:
• Provided, the budget and other
- Page 102 and 103:
Chapter Eight Implementation Plan o
- Page 104 and 105:
Conduct study on possibility of pub
- Page 106 and 107:
1.5 Impact evaluation of pilot cour
- Page 108 and 109:
2.6 Implementation and monitoring o
- Page 110 and 111:
3.4 Capacity enhancement of human r
- Page 112 and 113:
Annual and periodical conferences
- Page 114 and 115:
4.2 Manage vehicles, machinery and
- Page 116 and 117:
To update website and enhance the l
- Page 118 and 119:
To prescribe focal point for regula
- Page 120 and 121:
To frame and implement procedures r
- Page 122 and 123: 9.3 To review, amend and frame new
- Page 124 and 125: To coordinate with Law Commission f
- Page 126 and 127: 11.4 To strengthen services provide
- Page 128 and 129: Chapter Nine Budget Projection 109
- Page 130 and 131: CHAPTER NINE BUDGET PROJECTION Budg
- Page 132 and 133: 2 Members (Equivalent to Judge of C
- Page 134 and 135: 3.e Commercial Bench 1 Judges i Sal
- Page 136 and 137: y Clerks i Clerks (Judicial Non Gzt
- Page 138 and 139: 3 Other Courts and Tribunals 1 Spec
- Page 140 and 141: c Clerks i Clerks (Judicial ) Non G
- Page 142 and 143: Clerks i Clerks (Judicial ) Non Gzt
- Page 144 and 145: 2 Appellate Courts (including regio
- Page 146 and 147: 2 Labor Court a Stationary i Office
- Page 148 and 149: 4 Revenue Tribunals a Stationary i
- Page 150 and 151: 6 Judgment Execution Directorate a
- Page 152 and 153: Strategic Interventions 1-12 Amount
- Page 154 and 155: m To conduct feasibility study of p
- Page 156 and 157: SI 2 To make judgment implementatio
- Page 158 and 159: c To conduct necessary work for inc
- Page 160 and 161: j Language capacity training i Reso
- Page 162 and 163: Bench Officers i Resource Persons R
- Page 164 and 165: ze Annual and Periodical Confrences
- Page 166 and 167: Partial Land Acquisition/Purchase 1
- Page 168 and 169: 6 Residence Building for Judges and
- Page 170 and 171: xxxxii Chitwan Rs. 200,000 x 1 Time
- Page 174 and 175: Cost included in SI 5 h To establis
- Page 176 and 177: 7.2 To manage and strengthen securi
- Page 178 and 179: SI 9 To institutionalize research r
- Page 180 and 181: SI 10 To strengthen institutional r
- Page 182 and 183: To disseminate information so as to
- Page 184 and 185: Periodic evaluation/review of imple
- Page 186 and 187: Strategic Intervention (1-12) SI 1
- Page 188 and 189: ANNEXES ANNEX 1 Organogram of the C
- Page 190 and 191: Legal Aid Section Full Court & othe
- Page 192 and 193: ANNEX 3 Description of manpower A.
- Page 194 and 195: 41 Syangja 374 2 187 35 4 2 28 9 42
- Page 196 and 197: C. District Courts S. N. Courts No
- Page 198 and 199: A. Supreme Court S. No. 1 Supreme C
- Page 200 and 201: 43 Bajura X - - - X X 1 located to
- Page 202 and 203: 50. Hon. Judge Mr. Bhola Prasad Kha
- Page 204 and 205: 162. Hon. District Judge Mr. Lekh N
- Page 206 and 207: 32 Member Mr. Prem Singh Dhami Supr
- Page 208 and 209: 23 Non-gazetted 2 nd class Mr. Dine
- Page 210 and 211: Officials and Members of Central Ju
- Page 212 and 213: 3. Plan Formulation Consultation Pr
- Page 214 and 215: D. Joint consultation meeting betwe
- Page 216 and 217: 2. District Courts S. No. Name of C
- Page 218 and 219: Values Allegiance to the Constituti