Table 1. Process induced building defects inflicted on masonry structures (302 building defect assignments<br />

related to masonry in the 20-year period 1983-2002). Categories of causes of defects are distributed by<br />

frequency according to the percentage of building defect cases associated with the main cause of defect (see<br />

Fig. 2 for illustrations)<br />

Main cause of defect Explanation<br />

A Shrinkage and thermal movement defects<br />

(34%)<br />

Movement joints missing, absence of sliding layer between<br />

masonry and foundation, concentrated tension loadings, locking<br />

of masonry to other structures<br />

B Deficient flashing (26%) Deficient door/window/parapet flashing, faulty drainpipes and<br />

roof gutters, faulty door/window installation<br />

C Deficient rain barrier (25%) Non-watertight/ porous mortar joints or disintegration of the<br />

surface, faults in composure of the rendering<br />

D Faulty painting system (18%) Unfortunate choice of paint, paint that is too vapour tight<br />

E Insufficient durability of masonry units (16%) Low frost resistance of bricks and mortar, sulphate attack on<br />

block<br />

F Deficient drainage of the wall (12%) Too narrow air-gap, mortar bridges between outer leaves and rear<br />

wall, missing drainage opening at bottom of wall<br />

G Lack of compatibility (adhesion) (11%) Inadequate adhesion rendering/substructure, lack of compatibility<br />

mortar joints/masonry units<br />

H Reinforcement corrosion (9%) Corrosion on reinforcement<br />

I Under dimensioning (8%) Anchorage to rear wall missing, insufficient bearing capacity,<br />

earth pressure, overload<br />

J Settling/ Settlements (7%) Settling defects, soil mechanics<br />

K Moisture absorption from the ground (7%) Raising damp, capillary action, deficient drainage<br />

L Aesthetic problems (4%) Organic growth, unsatisfactory colour and structural variations,<br />

efflorescence of salts (not causing defects)<br />

M Salt eruption (3%) Crypto-efflorescence of salts causing scaling of rendering or<br />

bricks/blocks<br />

N Thermal bridges (3%) Heat loss, condensation, staining, discolouration<br />

Process induced building defects inflicted on masonry structures are presented in<br />

Table 1, and illustrated in Fig. 2. The masonry defects are grouped according to a system<br />

developed as part of the examination. Main categories of causes of defects are in Fig. 2<br />

distributed by frequency according to the percentage of building defect cases associated<br />

with the main cause of defect (thus, the percentage of defects do not add to 100%).<br />

Shrinkage and thermal expansion/contraction without the necessary countermeasures are<br />

the most common cause of defect, registered in one third of all cases of masonry defects<br />

analysed. Furthermore, the investigation reveals that two thirds of all cases comprise faults<br />

in the execution of the actual rain barrier (non water-tight mortar joints and rendering),<br />

drainage from the air gap (insufficient air gaps, mortar bridges between outer leaf and rear<br />

wall as well as missing drainage openings at bottom of wall) and the execution of window<br />

and parapet flashing.<br />