Appendix A – <strong>CADD</strong> Information Table Revised January 20, 2012<br />

By Level Attributes<br />

Level Name Description<br />

Color<br />

Style<br />

BR – BRIDGE – PROPOSED (cont’d):<br />

Weight<br />

Transparency<br />

Priority<br />

Cell Name Cell Library Name<br />

BR_P_Dia_Reinforcing Diaphragm Reinforcing 6 brebarpr 1 0 100 C<br />

BR_P_Dia_Stl_Det<br />

Diaphragm Steel Details<br />

(Connections, plates, etc.)<br />

3 0 1 0 100<br />

BR_P_Dia_Stl_Det_Hidden Diaphragm Steel Details Hidden 3 bhiddenpr 0 0 100 C<br />

BR_P_Dia_Text Diaphragm Text and Dimensions 0 0 1 0 500<br />

BR_P_Drain_Centerline Bridge Drainage Centerline 4 bcenterline 1 0 100 C<br />

BR_P_Drain_Hidden Bridge Drainage Hidden 7 bhiddenpr 1 0 100 C<br />

BR_P_Drain_Object Bridge Drainage Object 7 0 2 0 100<br />

BR_P_Drain_Text Bridge Drainage Text 0 0 1 0 500<br />

BR_P_Gen_Approach_Slab General Bridge Approach Slab 6 0 2 0 100<br />

BR_P_Gen_Approach_Slab_Hidden General Bridge Approach Slab-Hidden 6 bhiddenpr 1 0 100 C<br />

BR_P_Gen_Centerline Centerline <strong>of</strong> Lane, CL Roadway in elevations 0 bcenterline 1 0 100 C<br />

BR_P_Gen_CL_Chord Centerline Chord 3 0 1 0 100<br />

BR_P_Gen_Ground_Slope General Bridge Ground Slope 40 0 1 0 100<br />

BR_P_Gen_Hatch<br />

General Bridge Hatching<br />

(Architectural patterns, etc.)<br />

42 0 0 0 100<br />

BR_P_Gen_Joint_Filler General Bridge Joint Filler (PEJF, etc.) 4 0 0 0 100<br />

BR_P_Gen_NonPerf_Pipe General Bridge NonPerforated Pipe 4 0 0 0 100<br />

BR_P_Gen_Perforated_Pipe General Bridge Perforated Pipe 7 0 0 0 100<br />

BR_P_Gen_Phase_Construction Phase Construction Line 6 bconstruction 1 0 100 C<br />

BR_P_Gen_Porous_Backfill General Bridge Porous Backfill 2 0 0 0 100<br />

BR_P_Gen_Pr<strong>of</strong>ile_Grade Pr<strong>of</strong>ile Grade 7 bcenterline 1 0 100 C<br />

BR_P_Gen_Sheet_Piling General Bridge Sheet Piling 6 0 0 0 100<br />

BR_P_Gen_Slope_Protection General Bridge Slope Protection 40 0 2 0 100<br />

BR_P_Gen_Text<br />

General Bridge Text and Dimensions 0 0 1 0 500<br />

CELLS PLACED ON LEVEL BR_P_Gen_Text:<br />

Battered Pile Equation - - - 0 500 BAT_PILE_EQUATION ODOT_Bridge.cel C<br />

Arrowhead Filled - - - 0 500 BTERMF ODOT_Bridge.cel C<br />

C = Cosmetic<br />

P = Physical<br />

Levels Do Not<br />

Plot<br />

NOTE: * Indicates Not By Level Page 8 <strong>of</strong> 108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!