08.04.2013 Views

Rescue - Petzl

Rescue - Petzl

Rescue - Petzl

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Installing a fixed line<br />

2. Belay by self-lowering<br />

4. Attach the end of the rope that was on the harness to the<br />

station. Tighten the fixed line slightly, attach the second rope end<br />

with a figure eight knot. The end of the rope stays in the storage<br />

bag.<br />

35<br />

Contents<br />

3. Tie into the station. Tie off the rope on the PIRANA if both<br />

hands are needed for tying into the anchors.<br />

5. The second can reach the station by moving while<br />

connected to the fixed line. Once the entire party has passed,<br />

the rope can be pulled without leaving any equipment on the<br />

first anchors.<br />

PIRANA<br />

The PIRANA descender was designed specially for canyoning. It offers<br />

multiple braking options and can be installed on the rope without removing<br />

it from the harness. Used with an ATTACHE locking carabiner (comes<br />

separately), it makes a solid set-up that is practically impossible to<br />

lose once installed on the harness. Reduces the risk of leverage on the<br />

carabiner gate due to poor positioning. The PIRANA helps prevent the<br />

formation of a lark’s head hitch around the body and reduces rope twisting,<br />

without decreasing braking friction.<br />

Information is non-exhaustive. Refer to the other pages as well as to the user instructions and technical manuals. Technical training is essential.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!