07.04.2013 Views

ANNUAL REPORT 2011 - DONG Energy

ANNUAL REPORT 2011 - DONG Energy

ANNUAL REPORT 2011 - DONG Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

08 Fee to auditor appointed at the Annual General Meeting<br />

DKK million <strong>2011</strong> 2010<br />

Audit fees (12) (12)<br />

Other assurance engagements (2) (1)<br />

Tax and VAT advice (7) (6)<br />

Non-audit services (30) (7)<br />

total fees to pricewaterhouseCoopers (51) (26)<br />

09 Other operating income and expenses<br />

DKK million <strong>2011</strong> 2010<br />

Gain on sale of intangible assets and property, plant and equipment 165 184<br />

Miscellaneous operating income 115 111<br />

Other operating income 280 295<br />

Loss on sale of intangible assets and property, plant and equipment (229) (46)<br />

Miscellaneous operating expenses (41) (11)<br />

Other operating expenses (270) (57)<br />

Other operating income and expenses, net 10 238<br />

The gain on sale of intangible assets and property, plant and<br />

equipment comprised primarily sale of the Gunfl eet Sands<br />

and Barrow Offshore Wind offshore wind farm transmission<br />

networks and 50% of the Walney network (Walney 1). The loss<br />

10 Government grants<br />

on sale of intangible assets and property, plant and equipment<br />

was attributable to a loss on scrapping of production assets on<br />

the Gyda oil fi eld. The gain in 2010 comprised primarily Nysted<br />

Offshore Wind Farm 1.<br />

DKK million <strong>2011</strong> 2010<br />

Government grants recognised in profi t for the year as revenue 311 315<br />

Government grants recognised in profi t for the year as other operating income 21 20<br />

Government grants recognised in the balance sheet 4 (15)<br />

Government grants recognised during the year 336 320<br />

Grants recognised as revenue related to electricity generation<br />

based on biomass and waste, and natural gas at small-scale<br />

power stations.<br />

<strong>DONG</strong> <strong>Energy</strong> also received grants for feasibility studies in<br />

connection with the establishment of installations and for<br />

the construction of facilities. Government grants received<br />

have been recognised in liabilities and transferred to other<br />

operating income as the assets to which the grants relate are<br />

depreciated.<br />

<strong>DONG</strong> ENERGY <strong>DONG</strong> ENERGY GROUP <strong>ANNUAL</strong> <strong>REPORT</strong> <strong>2011</strong> – COnsOliDatED finanCial statEmEnts<br />

85 81<br />

notes

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!