ReVIew of BusIness aReas’ PERFORMANCE<br />

Performance<br />

The financial and environmental performance of each of<br />

the Group’s five business areas in <strong>2011</strong> is commented on in<br />

the following.<br />

Exploration & Production<br />

performance highlights <strong>2011</strong> 2010<br />

Volumes<br />

Oil and gas production million boe 26.4 24.4<br />

- oil million boe 9.3 9.0<br />

- gas<br />

Financial performance<br />

million boe 17.1 15.4<br />

Revenue DKK million 10,469 8,264<br />

EBITDA<br />

EBITDA adjusted<br />

DKK million 5,684 5,051<br />

for hydrocarbon tax DKK million 4,208 4,085<br />

EBIT DKK million 3,204 3,101<br />

Adjusted operating<br />

profi t DKK million 1,628 2,036<br />

Gross investments DKK million (5,626) (4,023)<br />

Capital employed<br />

Capital employed DKK million 18,186 17,122<br />

PPE under construction DKK million (8,381) (6,357)<br />

Exploration assets<br />

Production assets<br />

transferred from PPE<br />

under construction in<br />

DKK million (1,611) (975)<br />

the past six months DKK million (335) (417)<br />

Adjusted capital<br />

employed DKK million 7,859 9,373<br />

Environment<br />

EU ETS CO2 emissions<br />

million<br />

tonnes 0.1 0.1<br />

Gas fl aring million Nm 3 8 32<br />

Oil discharged to sea tonnes 16 8<br />

Reinjection of<br />

produced water on<br />

production platforms % 68 78<br />

volumes<br />

Oil and gas production was up 8% at 26.4 million boe in <strong>2011</strong>.<br />

Oil production was 3% ahead at 9.3 million boe, primarily<br />

due to the start-up of production at the Trym oil and<br />

gas field. Production from Siri was lower due its periodical<br />

closure as a result of tightened safety precautions while the<br />

platform is being repaired.<br />

Gas production, which came primarily from the Ormen<br />

Lange field in Norway, rose by 11% to 17.1 million boe in <strong>2011</strong>,<br />

representing 65% of total production. 18% of production<br />

came from Danish fields and 82% from Norwegian fields.<br />

financial performance<br />

Revenue was DKK 10.5 billion, DKK 2.2 billion ahead of<br />

2010. Revenue benefited from the higher oil and gas prices<br />

and higher production. Oil price hedging had a negative<br />

impact due to the higher oil prices.<br />

EBITDA increased by DKK 0.6 billion to DKK 5.7 billion in<br />

<strong>2011</strong>, primarily due to the increase in revenue, which was<br />

partly offset by higher exploration costs. Costs for the repair<br />

of the subsea structure at the Siri platform were<br />

DKK 0.8 billion in <strong>2011</strong>, of which DKK 0.6 billion related to<br />

the permanent repair solution. The repair work on the Siri<br />

platform is expected to be completed in 2013.<br />

EBIT was up DKK 0.1 billion on 2010, which was less<br />

than the increase in EBITDA as a result of higher depreciation<br />

in Norway, primarily reflecting the start-up of production<br />

at Trym.<br />

Environment<br />

Discharges of oil to sea together with produced water<br />

from the oil and gas exploration activities amounted to<br />

16 tonnes in <strong>2011</strong> against 8 tonnes in 2010. The increase<br />

mainly reflected significantly higher volumes of produced<br />

water at the older Norwegian fields Ula and Gyda, as a<br />

natural outcome of their production patterns.<br />

On the Siri platform, which is operated by <strong>DONG</strong><br />

<strong>Energy</strong>, 2.2 tonnes of oil was discharged, compared with<br />

2.7 tonnes in 2010. The reduction primarily reflected an<br />

unchanged cleaning efficiency and increased reinjection of<br />

produced water into the reservoir.<br />

Reinjection of oil-containing produced water was reduced to<br />

68%, overall, compared with 78% in 2010, while reinjection<br />

from the Siri platform improved from 94% to 97% in <strong>2011</strong>.<br />

<strong>DONG</strong> <strong>Energy</strong>’s share of gas flaring on the Siri platform<br />

was 3 million Nm3 in <strong>2011</strong>, matching the 2009 level, which<br />

led to a decrease in EU ETS CO emissions. The unusually<br />

2<br />

high level of gas flaring on the Siri platform in 2010, 29<br />

million Nm3 , was due to challenges related to treatment of<br />

the gas from the new satellite platform Nini Øst, which is<br />

connected to the Siri platform.<br />

Wind Power<br />

36<br />

manaGEmEnt’s rEviEw – <strong>DONG</strong> ENERGY GROUP <strong>ANNUAL</strong> <strong>ANNUAL</strong> <strong>REPORT</strong> <strong>REPORT</strong> <strong>2011</strong> <strong>2011</strong><br />

performance highlights <strong>2011</strong> 2010<br />

Volumes<br />

Electricity generation,<br />

wind and hydro TWh 4.4 4.0<br />

Financial performance<br />

Revenue DKK million 4,312 2,952<br />

EBITDA DKK million 1,799 1,730<br />

EBIT<br />

Adjusted operating<br />

DKK million 856 959<br />

profi t DKK million 861 979<br />

Gross investments<br />

Capital employed<br />

DKK million (10,872) (6,378)<br />

Capital employed DKK million 29,443 21,097<br />

PPE under construction DKK million<br />

Production assets<br />

transferred from PPE<br />

under construction in<br />

(13,859) (7,483)<br />

the past six months<br />

Adjusted capital<br />

DKK million (1,851) (792)<br />

employed DKK million 13,733 12,822