annual report 2009<br />
Authority Controlled (Highest) Natural Gas System Usage Prices (Excluding VAT 1 ) 2 in Hungary as <strong>of</strong> <strong>the</strong> 1st <strong>of</strong> July<br />
2009<br />
1. a) Transmission tariff system<br />
Table 7.7<br />
a) Transmission charge<br />
exit point 2 221<br />
Kiskundorozsma exit point -<br />
Csanádpalota exit point -<br />
Austrian/<strong>Hungarian</strong> border<br />
(Baumgarten) entry point<br />
12 144<br />
Ukrainian/<strong>Hungarian</strong> border<br />
(Beregovo) entry point<br />
12 144<br />
internal production entry point 10 930<br />
storage entry point 7 287<br />
1. b) Odouring Charge<br />
odouring charge (HUF/l)<br />
4 039<br />
2. Distribution Charges<br />
Charged system users<br />
3<br />
Customers with contracted capacity between 101-500 m /h<br />
3<br />
Customers with contracted capacity above 500 m /h<br />
Distribution<br />
lump charge<br />
HUF/m3<br />
Customers without gas meter 11.85<br />
Transmission capacity charges Transmission traffic charges<br />
(HUF/(m 3/h)/year) (HUF/m 3)<br />
Distribution<br />
standing<br />
charge<br />
HUF/year<br />
3<br />
Customers with gas meters below 20 m /h 6 828<br />
0,833<br />
Distribution<br />
standing<br />
charge<br />
HUF/m 3/h/year<br />
3<br />
Customers with gas meters between 20-100 m /h 9 900<br />
Distribution<br />
capacity<br />
charge<br />
HUF/m 3/h/year<br />
Distribution<br />
gas charge<br />
HUF/m3<br />
5.71<br />
12 912 0.79<br />
11 892<br />
7.40<br />
0.83<br />
annual report 2009 | 79