hungarian energy <strong>of</strong>fice<br />
REGULATION OF DISTRICT HEAT PRODUCTION<br />
REGULATION<br />
Licensing<br />
The activities <strong>of</strong> district heat production and supply are still<br />
subject to license. The establishment <strong>of</strong> district heat production<br />
facilities is subject to license only over a heat output <strong>of</strong> 5<br />
MW. Licensing competence is distributed between <strong>the</strong> local<br />
governments and HEO. All district heat generators that also<br />
generate electricity must apply for a license to HEO, while<br />
district heat generating activity without electricity generation<br />
falls under <strong>the</strong> authority <strong>of</strong> <strong>the</strong> local governments.<br />
The licensing and supervision <strong>of</strong> district heat suppliers has<br />
been transferred as a whole to <strong>the</strong> notary <strong>of</strong> local governments.<br />
The tasks <strong>of</strong> consumer protection are provided for by <strong>the</strong><br />
inspectorates for consumer protection. The setting <strong>of</strong> consumer<br />
tariffs remained within <strong>the</strong> authority <strong>of</strong> <strong>the</strong> representative<br />
council <strong>of</strong> <strong>the</strong> local governments <strong>of</strong> settlements, and in <strong>the</strong> case<br />
<strong>of</strong> Budapest, <strong>of</strong> <strong>the</strong> metropolitan municipality. Before setting<br />
<strong>the</strong> tariffs, <strong>the</strong> Minister <strong>of</strong> Transport, Telecommunication and<br />
<strong>Energy</strong> gave its opinion on <strong>the</strong> prices <strong>of</strong> district heat supply,<br />
this, however, was abandoned from 1 July 2009, and <strong>the</strong><br />
District Heat Competitiveness Act (amending in this subject<br />
<strong>the</strong> District Heat Act) extended <strong>the</strong> authority <strong>of</strong> HEO to <strong>the</strong><br />
price control <strong>of</strong> <strong>the</strong> district heat supply. HEO has a tw<strong>of</strong>old<br />
responsibility in <strong>the</strong> enforcement <strong>of</strong> <strong>the</strong> Act:<br />
• To conduct <strong>the</strong> price control procedure initiated by <strong>the</strong><br />
district heat supplier with <strong>the</strong> purpose <strong>of</strong> changing <strong>the</strong><br />
district heat connection fee and <strong>the</strong> prices <strong>of</strong> <strong>the</strong> residential<br />
district heat supply;<br />
• Administrative control launched ex <strong>of</strong>fi cio:<br />
- to conduct a price control procedure at <strong>the</strong> district heat<br />
suppliers to supervise <strong>the</strong> district heat connection fee and<br />
<strong>the</strong> price <strong>of</strong> <strong>the</strong> residential district heat supply;<br />
- to conduct a price control procedure that aims to<br />
supervise <strong>the</strong> price determined in <strong>the</strong> contract <strong>of</strong> <strong>the</strong><br />
district heat producer and <strong>the</strong> district heat supplier.<br />
District heat and electricity licensing procedure <strong>of</strong> power<br />
plants under 50 MW<br />
The licensing procedure <strong>of</strong> small power plants co-generating<br />
heat and electricity (power plant with a nominal electric power<br />
under 50 MW) is different for district heat and for electricity.<br />
• District heat licensing procedure: in <strong>the</strong> case <strong>of</strong> <strong>the</strong> establishment<br />
<strong>of</strong> a cogeneration equipment with a heat output<br />
<strong>of</strong> 5 MW or above, <strong>the</strong> applicant has to apply to HEO for<br />
a license for <strong>the</strong> establishment <strong>of</strong> a district heat production<br />
equipment (below 5 MW heat output, <strong>the</strong> establishment<br />
<strong>of</strong> a district heat production equipment is not subject to<br />
license). After <strong>the</strong> establishment <strong>of</strong> <strong>the</strong> equipment and<br />
following a successful test loading, <strong>the</strong> applicant has to<br />
apply for an operational license for district heat production<br />
irrespectively <strong>of</strong> <strong>the</strong> capacity.<br />
annual report 2009 | 42<br />
• Electricity licensing procedure: in <strong>the</strong> case <strong>of</strong> <strong>the</strong> establishment<br />
<strong>of</strong> an electricity generation equipment (including<br />
<strong>the</strong> establishment <strong>of</strong> a cogeneration equipment), if <strong>the</strong><br />
nominal electric capacity falls between 0.5 and 50 MW,<br />
<strong>the</strong> applicant has to apply to HEO for a simplifi ed licence<br />
for small power plants. The simplifi ed electricity<br />
generation license relates to <strong>the</strong> selection <strong>of</strong> <strong>the</strong> primary<br />
energy source <strong>of</strong> small power plants and to <strong>the</strong> electric<br />
energy generation.<br />
In <strong>the</strong> case an electric capacity between 0.5 and 50 MW and<br />
in <strong>the</strong> case <strong>of</strong> <strong>the</strong> establishment <strong>of</strong> power plants based on<br />
combined cycle electricity generation (co-generation) with a<br />
nominal heat output <strong>of</strong> 5 MW or above, <strong>the</strong> power plants have<br />
to submit <strong>the</strong> following applications to HEO in <strong>the</strong> following<br />
chronological order:<br />
In <strong>the</strong> period <strong>of</strong> selecting <strong>the</strong> primary energy source:<br />
Simplifi ed license for small power plants (on basis <strong>of</strong> <strong>the</strong><br />
Electricity Act)<br />
Before establishment:<br />
License for <strong>the</strong> establishment <strong>of</strong> district heat production<br />
equipment (based on <strong>the</strong> District Heat Act)<br />
After commissioning:<br />
Operational license for district heat production (based on <strong>the</strong><br />
District Heat Act)