hungarian energy <strong>of</strong>fice<br />

REGULATION OF DISTRICT HEAT PRODUCTION<br />

REGULATION<br />

Licensing<br />

The activities <strong>of</strong> district heat production and supply are still<br />

subject to license. The establishment <strong>of</strong> district heat production<br />

facilities is subject to license only over a heat output <strong>of</strong> 5<br />

MW. Licensing competence is distributed between <strong>the</strong> local<br />

governments and HEO. All district heat generators that also<br />

generate electricity must apply for a license to HEO, while<br />

district heat generating activity without electricity generation<br />

falls under <strong>the</strong> authority <strong>of</strong> <strong>the</strong> local governments.<br />

The licensing and supervision <strong>of</strong> district heat suppliers has<br />

been transferred as a whole to <strong>the</strong> notary <strong>of</strong> local governments.<br />

The tasks <strong>of</strong> consumer protection are provided for by <strong>the</strong><br />

inspectorates for consumer protection. The setting <strong>of</strong> consumer<br />

tariffs remained within <strong>the</strong> authority <strong>of</strong> <strong>the</strong> representative<br />

council <strong>of</strong> <strong>the</strong> local governments <strong>of</strong> settlements, and in <strong>the</strong> case<br />

<strong>of</strong> Budapest, <strong>of</strong> <strong>the</strong> metropolitan municipality. Before setting<br />

<strong>the</strong> tariffs, <strong>the</strong> Minister <strong>of</strong> Transport, Telecommunication and<br />

<strong>Energy</strong> gave its opinion on <strong>the</strong> prices <strong>of</strong> district heat supply,<br />

this, however, was abandoned from 1 July 2009, and <strong>the</strong><br />

District Heat Competitiveness Act (amending in this subject<br />

<strong>the</strong> District Heat Act) extended <strong>the</strong> authority <strong>of</strong> HEO to <strong>the</strong><br />

price control <strong>of</strong> <strong>the</strong> district heat supply. HEO has a tw<strong>of</strong>old<br />

responsibility in <strong>the</strong> enforcement <strong>of</strong> <strong>the</strong> Act:<br />

• To conduct <strong>the</strong> price control procedure initiated by <strong>the</strong><br />

district heat supplier with <strong>the</strong> purpose <strong>of</strong> changing <strong>the</strong><br />

district heat connection fee and <strong>the</strong> prices <strong>of</strong> <strong>the</strong> residential<br />

district heat supply;<br />

• Administrative control launched ex <strong>of</strong>fi cio:<br />

- to conduct a price control procedure at <strong>the</strong> district heat<br />

suppliers to supervise <strong>the</strong> district heat connection fee and<br />

<strong>the</strong> price <strong>of</strong> <strong>the</strong> residential district heat supply;<br />

- to conduct a price control procedure that aims to<br />

supervise <strong>the</strong> price determined in <strong>the</strong> contract <strong>of</strong> <strong>the</strong><br />

district heat producer and <strong>the</strong> district heat supplier.<br />

District heat and electricity licensing procedure <strong>of</strong> power<br />

plants under 50 MW<br />

The licensing procedure <strong>of</strong> small power plants co-generating<br />

heat and electricity (power plant with a nominal electric power<br />

under 50 MW) is different for district heat and for electricity.<br />

• District heat licensing procedure: in <strong>the</strong> case <strong>of</strong> <strong>the</strong> establishment<br />

<strong>of</strong> a cogeneration equipment with a heat output<br />

<strong>of</strong> 5 MW or above, <strong>the</strong> applicant has to apply to HEO for<br />

a license for <strong>the</strong> establishment <strong>of</strong> a district heat production<br />

equipment (below 5 MW heat output, <strong>the</strong> establishment<br />

<strong>of</strong> a district heat production equipment is not subject to<br />

license). After <strong>the</strong> establishment <strong>of</strong> <strong>the</strong> equipment and<br />

following a successful test loading, <strong>the</strong> applicant has to<br />

apply for an operational license for district heat production<br />

irrespectively <strong>of</strong> <strong>the</strong> capacity.<br />

annual report 2009 | 42<br />

• Electricity licensing procedure: in <strong>the</strong> case <strong>of</strong> <strong>the</strong> establishment<br />

<strong>of</strong> an electricity generation equipment (including<br />

<strong>the</strong> establishment <strong>of</strong> a cogeneration equipment), if <strong>the</strong><br />

nominal electric capacity falls between 0.5 and 50 MW,<br />

<strong>the</strong> applicant has to apply to HEO for a simplifi ed licence<br />

for small power plants. The simplifi ed electricity<br />

generation license relates to <strong>the</strong> selection <strong>of</strong> <strong>the</strong> primary<br />

energy source <strong>of</strong> small power plants and to <strong>the</strong> electric<br />

energy generation.<br />

In <strong>the</strong> case an electric capacity between 0.5 and 50 MW and<br />

in <strong>the</strong> case <strong>of</strong> <strong>the</strong> establishment <strong>of</strong> power plants based on<br />

combined cycle electricity generation (co-generation) with a<br />

nominal heat output <strong>of</strong> 5 MW or above, <strong>the</strong> power plants have<br />

to submit <strong>the</strong> following applications to HEO in <strong>the</strong> following<br />

chronological order:<br />

In <strong>the</strong> period <strong>of</strong> selecting <strong>the</strong> primary energy source:<br />

Simplifi ed license for small power plants (on basis <strong>of</strong> <strong>the</strong><br />

Electricity Act)<br />

Before establishment:<br />

License for <strong>the</strong> establishment <strong>of</strong> district heat production<br />

equipment (based on <strong>the</strong> District Heat Act)<br />

After commissioning:<br />

Operational license for district heat production (based on <strong>the</strong><br />

District Heat Act)