and retail market players who, following a market analysis,<br />

turn out to have signifi cant market power. The imposition<br />

<strong>of</strong> obligations all served to prevent <strong>the</strong> abuse <strong>of</strong> market<br />

power and enhance <strong>the</strong> effi ciency <strong>of</strong> competition. HEO,<br />

in cooperation with GVH and relying on market analyses,<br />

designates <strong>the</strong> licensees as having signifi cant market power<br />

and imposes special additional obligations adjusted to <strong>the</strong>ir<br />

market positions.<br />

HEO regarded <strong>the</strong> termination and renegotiation <strong>of</strong> PPAs in<br />

2008 as a signifi cant event from <strong>the</strong> viewpoint <strong>of</strong> competition,<br />

<strong>the</strong>refore decided in September 2009 to launch a new SMP<br />

procedure both on wholesale and on ancillary services.<br />

SECURITY OF SUPPLY<br />

Security <strong>of</strong> electricity supply<br />

Preparations for winter<br />

HEO assessed <strong>the</strong> preparedness <strong>of</strong> licensees participating in<br />

electricity supply and <strong>the</strong> expected level <strong>of</strong> security <strong>of</strong> supply<br />

taking into account <strong>the</strong> below terms:<br />

a) Implementation <strong>of</strong> <strong>the</strong> annual planned maintenances and<br />

developments (plan and fact fi gures),<br />

b) Ensuring fuels required for <strong>the</strong> production expected in <strong>the</strong><br />

winter months, according to fuel types,<br />

c) Availability <strong>of</strong> reserves specifi ed in GKM Decree 44/2002<br />

(28.12) on <strong>the</strong> least measure <strong>of</strong> <strong>the</strong> stockpile <strong>of</strong> energy<br />

carriers for power plants <strong>of</strong> 50 MW or above and on <strong>the</strong><br />

order <strong>of</strong> stockpiling,<br />

d) electric capacity, electricity balance, availability <strong>of</strong> reserve<br />

capacities,<br />

e) availability <strong>of</strong> cross-border capacities.<br />

annual report 2009<br />

HEO examined and evaluated <strong>the</strong> preparations <strong>of</strong> licensees for<br />

<strong>the</strong> winter period, and drew <strong>the</strong> following conclusions:<br />

• The power plants accomplished <strong>the</strong>ir winter preparation<br />

programs.<br />

• The power plants accomplished <strong>the</strong>ir annual maintenance<br />

programs till 15 November 2009.<br />

• The supply <strong>of</strong> power plants with fuel is ensured by<br />

contracts.<br />

• All power plants for which <strong>the</strong> decrees prescribe <strong>the</strong> fuel<br />

stockpiles possessed <strong>the</strong> required stock.<br />

Gas restrictions due to <strong>the</strong> Russian-Ukrainien gas debate in<br />

January 2009 resulted in <strong>the</strong> fact that power plants suitable<br />

for oil fuelling had to switch to oil fuelling. The majority <strong>of</strong><br />

power plants was successful in switching, however, <strong>the</strong>re<br />

were some power plants that experienced technical problems.<br />

In <strong>the</strong> period <strong>of</strong> oil fuelling, stocks were decreasing, which<br />

referred to <strong>the</strong> fact that <strong>the</strong> oil could not have been replaced<br />

everywhere at due pace. HEO used <strong>the</strong> experience gained in<br />

<strong>the</strong> course <strong>of</strong> switching for <strong>the</strong> inspections <strong>of</strong> preparations for<br />

winter.<br />

In <strong>the</strong> winter period, <strong>the</strong> capacity balance <strong>of</strong> <strong>the</strong> <strong>Hungarian</strong><br />

electricity system can be regarded as reassuring if <strong>the</strong> import<br />

capacities on <strong>the</strong> nor<strong>the</strong>rn and eastern borders do not decrease<br />

signifi cantly, and <strong>the</strong> export on <strong>the</strong> sou<strong>the</strong>rn borders do not<br />

increase signifi cantly. In this case, <strong>the</strong> available capacity is<br />

suffi cient to satisfy <strong>the</strong> demand, and also <strong>the</strong> reserve capacity,<br />

which is suffi cient according to <strong>the</strong> plans, is available. In<br />

<strong>the</strong> cold winter period, however, natural gas disconnection<br />

may occur in <strong>the</strong> case <strong>of</strong> <strong>the</strong> hydrocarbon fi red power plants,<br />

<strong>the</strong>refore <strong>the</strong> cooperation between <strong>the</strong> MAVIR dispatch centre<br />

and <strong>the</strong> MOL dispatch centre is a must. Though measures<br />

were taken in order to prevent <strong>the</strong> coal from being winterkilled,<br />

such an event cannot be fully excluded. A case like this<br />

could hinder <strong>the</strong> generation <strong>of</strong> <strong>the</strong> Mátra Power Plant and a<br />

quick measurement would be necessary to involve reserves.<br />

Network development<br />

The transmission system operator MAVIR Zrt. is responsible<br />

for ensuring <strong>the</strong> long term and secure availability <strong>of</strong> <strong>the</strong> system<br />

with its development, maintenance and operation activities on<br />

<strong>the</strong> transmission network constituting part <strong>of</strong> <strong>the</strong> <strong>Hungarian</strong><br />

electricity system, in line with <strong>Hungarian</strong> and international<br />

requirements and thus providing for <strong>the</strong> maintenance <strong>of</strong> <strong>the</strong><br />

domestic electricity supply at a European level. Within <strong>the</strong><br />

framework <strong>of</strong> network development:<br />