and retail market players who, following a market analysis,<br />
turn out to have signifi cant market power. The imposition<br />
<strong>of</strong> obligations all served to prevent <strong>the</strong> abuse <strong>of</strong> market<br />
power and enhance <strong>the</strong> effi ciency <strong>of</strong> competition. HEO,<br />
in cooperation with GVH and relying on market analyses,<br />
designates <strong>the</strong> licensees as having signifi cant market power<br />
and imposes special additional obligations adjusted to <strong>the</strong>ir<br />
market positions.<br />
HEO regarded <strong>the</strong> termination and renegotiation <strong>of</strong> PPAs in<br />
2008 as a signifi cant event from <strong>the</strong> viewpoint <strong>of</strong> competition,<br />
<strong>the</strong>refore decided in September 2009 to launch a new SMP<br />
procedure both on wholesale and on ancillary services.<br />
SECURITY OF SUPPLY<br />
Security <strong>of</strong> electricity supply<br />
Preparations for winter<br />
HEO assessed <strong>the</strong> preparedness <strong>of</strong> licensees participating in<br />
electricity supply and <strong>the</strong> expected level <strong>of</strong> security <strong>of</strong> supply<br />
taking into account <strong>the</strong> below terms:<br />
a) Implementation <strong>of</strong> <strong>the</strong> annual planned maintenances and<br />
developments (plan and fact fi gures),<br />
b) Ensuring fuels required for <strong>the</strong> production expected in <strong>the</strong><br />
winter months, according to fuel types,<br />
c) Availability <strong>of</strong> reserves specifi ed in GKM Decree 44/2002<br />
(28.12) on <strong>the</strong> least measure <strong>of</strong> <strong>the</strong> stockpile <strong>of</strong> energy<br />
carriers for power plants <strong>of</strong> 50 MW or above and on <strong>the</strong><br />
order <strong>of</strong> stockpiling,<br />
d) electric capacity, electricity balance, availability <strong>of</strong> reserve<br />
capacities,<br />
e) availability <strong>of</strong> cross-border capacities.<br />
annual report 2009<br />
HEO examined and evaluated <strong>the</strong> preparations <strong>of</strong> licensees for<br />
<strong>the</strong> winter period, and drew <strong>the</strong> following conclusions:<br />
• The power plants accomplished <strong>the</strong>ir winter preparation<br />
programs.<br />
• The power plants accomplished <strong>the</strong>ir annual maintenance<br />
programs till 15 November 2009.<br />
• The supply <strong>of</strong> power plants with fuel is ensured by<br />
contracts.<br />
• All power plants for which <strong>the</strong> decrees prescribe <strong>the</strong> fuel<br />
stockpiles possessed <strong>the</strong> required stock.<br />
Gas restrictions due to <strong>the</strong> Russian-Ukrainien gas debate in<br />
January 2009 resulted in <strong>the</strong> fact that power plants suitable<br />
for oil fuelling had to switch to oil fuelling. The majority <strong>of</strong><br />
power plants was successful in switching, however, <strong>the</strong>re<br />
were some power plants that experienced technical problems.<br />
In <strong>the</strong> period <strong>of</strong> oil fuelling, stocks were decreasing, which<br />
referred to <strong>the</strong> fact that <strong>the</strong> oil could not have been replaced<br />
everywhere at due pace. HEO used <strong>the</strong> experience gained in<br />
<strong>the</strong> course <strong>of</strong> switching for <strong>the</strong> inspections <strong>of</strong> preparations for<br />
winter.<br />
In <strong>the</strong> winter period, <strong>the</strong> capacity balance <strong>of</strong> <strong>the</strong> <strong>Hungarian</strong><br />
electricity system can be regarded as reassuring if <strong>the</strong> import<br />
capacities on <strong>the</strong> nor<strong>the</strong>rn and eastern borders do not decrease<br />
signifi cantly, and <strong>the</strong> export on <strong>the</strong> sou<strong>the</strong>rn borders do not<br />
increase signifi cantly. In this case, <strong>the</strong> available capacity is<br />
suffi cient to satisfy <strong>the</strong> demand, and also <strong>the</strong> reserve capacity,<br />
which is suffi cient according to <strong>the</strong> plans, is available. In<br />
<strong>the</strong> cold winter period, however, natural gas disconnection<br />
may occur in <strong>the</strong> case <strong>of</strong> <strong>the</strong> hydrocarbon fi red power plants,<br />
<strong>the</strong>refore <strong>the</strong> cooperation between <strong>the</strong> MAVIR dispatch centre<br />
and <strong>the</strong> MOL dispatch centre is a must. Though measures<br />
were taken in order to prevent <strong>the</strong> coal from being winterkilled,<br />
such an event cannot be fully excluded. A case like this<br />
could hinder <strong>the</strong> generation <strong>of</strong> <strong>the</strong> Mátra Power Plant and a<br />
quick measurement would be necessary to involve reserves.<br />
Network development<br />
The transmission system operator MAVIR Zrt. is responsible<br />
for ensuring <strong>the</strong> long term and secure availability <strong>of</strong> <strong>the</strong> system<br />
with its development, maintenance and operation activities on<br />
<strong>the</strong> transmission network constituting part <strong>of</strong> <strong>the</strong> <strong>Hungarian</strong><br />
electricity system, in line with <strong>Hungarian</strong> and international<br />
requirements and thus providing for <strong>the</strong> maintenance <strong>of</strong> <strong>the</strong><br />
domestic electricity supply at a European level. Within <strong>the</strong><br />
framework <strong>of</strong> network development:<br />