Electric power export, m, KW•hour<br />

5091.9<br />

3396<br />

5000<br />

4000<br />

3000<br />

1961<br />

1214.5<br />

2000<br />

1000<br />

0<br />

2010 <strong>2011</strong><br />

2010<br />

<strong>2011</strong><br />

Investments<br />

The total volume of DTEK's investment in <strong>2011</strong> amounted to<br />

$540m (excluding M&A).<br />

Coal mining and enrichment<br />

The growth in coal mining volumes in <strong>2011</strong> resulted from<br />

the holistic modernization and equipment upgrade programs.<br />

In <strong>2011</strong> DTEK purchased four coal mining units of the local<br />

(Ukrainian Machine Building Holding) and foreign (Ostroj<br />

and T.Machinery) producers, in total worth $55.1m.<br />

Of the purchased equipment, three units were intended for<br />

DTEK Pavlogradugol (worth $44.2m) and one – for DTEK Dobropolyeugol<br />

(worth $10.9m). Additionally DTEK purchased<br />

34 tunneling machines by SANY (China), Kopeysk Heavy Engineering<br />

Plant (Russian Federation), and Yasynyvata Heavy<br />

Engineering Plant (Ukraine) for the mines of DTEK Pavlogradugol,<br />

DTEK Dobropolyeugol, and DTEK Komsomolets Donbassa,<br />

in total worth $17.3m.<br />

In <strong>2011</strong>, the mines of DTEK Pavlogradugol and DTEK Komsomolets<br />

Donbassa began the installation of the underground<br />

hanging monorail transport. The total volume of project investment<br />

was $4m.<br />

DTEK continued the holistic modernization and technical upgrade<br />

program of its enterprises. The largest projects were implemented<br />

at Pavlogradskaya (commissioning the primary slime<br />

processing unit), DTEK Oktyabrskaya (installation of the dry<br />

screening equipment), and Dobropolskaya (replacement<br />

of the two jigging machines) Coal Enrichment Plants. All DTEK's<br />

coal enrichment enterprises performed replacements and capital<br />

repairs of equipment, in total worth more than $6m.<br />

37<br />

Coal export, thousand tonnes<br />

Power generation<br />

<strong>SCM</strong> <strong>GROUP</strong> <strong>PUBLIC</strong> <strong>REPORT</strong><br />

CREATING SUSTAINABLE VALUE<br />

3000<br />

2000<br />

1000<br />

In <strong>2011</strong>, DTEK's power generating enterprises continued<br />

the large-scale equipment upgrade program.<br />

During the year, power generating units #10 at Luganskaya<br />

TPP and #8 at Kurakhovskaya TPP (both Vostokenergo) were<br />

put out of operation for reconstruction. The modernization<br />

process will continue in 2012 and it is intended to include<br />

all main equipment of the power generating units: boilers,<br />

turbines, generators, and transformers. Additionally the automated<br />

technological processes' management system will<br />

be installed, as well as the electric filters and volume tanks for<br />

the purification of the exit gases from CO2 compounds will be<br />

modernized. As a result of the stated upgrades, the installed<br />

capacity of the power generating unit #10 at Luganskaya TPP<br />

will increase from 175MW to 210MW, while the weighted<br />

use of fuel will decrease by 63 g/KW*hour, and the maneuverability<br />

range will increase from 45MW to 80MW. The<br />

capacity of the Kurakhovskaya TPP power generating unit<br />

#8 is planned to increase from 210MW to 225MW, while<br />

the weighted use of fuel is planned to decrease by 40.6 g/<br />

KW*hour. The electric filter was also installed at the stated<br />

power generating unit, with 50 g/nm3 smoke filtering capacity,<br />

which is compliant with the requirements of the EU<br />

Directive 2001/80. The upgrades will help prolong the longevity<br />

of the stated power generating units for 15–20 years.<br />

The total volume of investment in the upgrade of the two<br />

power generating units at Luganskaya and Kurakhkovskaya<br />

TPP's amounted to approximately $112m.<br />

The volume of investment in Kievenergo's power generating<br />

facilities amounted to $5m during the reporting year. The<br />

largest reconstruction works were performed at the chemical<br />

facilities of TPP–5, using the ultrafiltration and autotransformation<br />

technologies.<br />