Electric power export, m, KW•hour<br />
5091.9<br />
3396<br />
5000<br />
4000<br />
3000<br />
1961<br />
1214.5<br />
2000<br />
1000<br />
0<br />
2010 <strong>2011</strong><br />
2010<br />
<strong>2011</strong><br />
Investments<br />
The total volume of DTEK's investment in <strong>2011</strong> amounted to<br />
$540m (excluding M&A).<br />
Coal mining and enrichment<br />
The growth in coal mining volumes in <strong>2011</strong> resulted from<br />
the holistic modernization and equipment upgrade programs.<br />
In <strong>2011</strong> DTEK purchased four coal mining units of the local<br />
(Ukrainian Machine Building Holding) and foreign (Ostroj<br />
and T.Machinery) producers, in total worth $55.1m.<br />
Of the purchased equipment, three units were intended for<br />
DTEK Pavlogradugol (worth $44.2m) and one – for DTEK Dobropolyeugol<br />
(worth $10.9m). Additionally DTEK purchased<br />
34 tunneling machines by SANY (China), Kopeysk Heavy Engineering<br />
Plant (Russian Federation), and Yasynyvata Heavy<br />
Engineering Plant (Ukraine) for the mines of DTEK Pavlogradugol,<br />
DTEK Dobropolyeugol, and DTEK Komsomolets Donbassa,<br />
in total worth $17.3m.<br />
In <strong>2011</strong>, the mines of DTEK Pavlogradugol and DTEK Komsomolets<br />
Donbassa began the installation of the underground<br />
hanging monorail transport. The total volume of project investment<br />
was $4m.<br />
DTEK continued the holistic modernization and technical upgrade<br />
program of its enterprises. The largest projects were implemented<br />
at Pavlogradskaya (commissioning the primary slime<br />
processing unit), DTEK Oktyabrskaya (installation of the dry<br />
screening equipment), and Dobropolskaya (replacement<br />
of the two jigging machines) Coal Enrichment Plants. All DTEK's<br />
coal enrichment enterprises performed replacements and capital<br />
repairs of equipment, in total worth more than $6m.<br />
37<br />
Coal export, thousand tonnes<br />
Power generation<br />
<strong>SCM</strong> <strong>GROUP</strong> <strong>PUBLIC</strong> <strong>REPORT</strong><br />
CREATING SUSTAINABLE VALUE<br />
3000<br />
2000<br />
1000<br />
In <strong>2011</strong>, DTEK's power generating enterprises continued<br />
the large-scale equipment upgrade program.<br />
During the year, power generating units #10 at Luganskaya<br />
TPP and #8 at Kurakhovskaya TPP (both Vostokenergo) were<br />
put out of operation for reconstruction. The modernization<br />
process will continue in 2012 and it is intended to include<br />
all main equipment of the power generating units: boilers,<br />
turbines, generators, and transformers. Additionally the automated<br />
technological processes' management system will<br />
be installed, as well as the electric filters and volume tanks for<br />
the purification of the exit gases from CO2 compounds will be<br />
modernized. As a result of the stated upgrades, the installed<br />
capacity of the power generating unit #10 at Luganskaya TPP<br />
will increase from 175MW to 210MW, while the weighted<br />
use of fuel will decrease by 63 g/KW*hour, and the maneuverability<br />
range will increase from 45MW to 80MW. The<br />
capacity of the Kurakhovskaya TPP power generating unit<br />
#8 is planned to increase from 210MW to 225MW, while<br />
the weighted use of fuel is planned to decrease by 40.6 g/<br />
KW*hour. The electric filter was also installed at the stated<br />
power generating unit, with 50 g/nm3 smoke filtering capacity,<br />
which is compliant with the requirements of the EU<br />
Directive 2001/80. The upgrades will help prolong the longevity<br />
of the stated power generating units for 15–20 years.<br />
The total volume of investment in the upgrade of the two<br />
power generating units at Luganskaya and Kurakhkovskaya<br />
TPP's amounted to approximately $112m.<br />
The volume of investment in Kievenergo's power generating<br />
facilities amounted to $5m during the reporting year. The<br />
largest reconstruction works were performed at the chemical<br />
facilities of TPP–5, using the ultrafiltration and autotransformation<br />
technologies.<br />
0<br />