05.04.2013 Views

Rep o rt of th e tw en - Rotterdam Convention

Rep o rt of th e tw en - Rotterdam Convention

Rep o rt of th e tw en - Rotterdam Convention

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. Control measures in <strong>th</strong>e id<strong>en</strong>tified zones<br />

These may include:<br />

• setting <strong>th</strong>e time period for <strong>th</strong>e implem<strong>en</strong>tation and continued application <strong>of</strong> control<br />

measures;<br />

• determining and mapping <strong>th</strong>e relevant zones;<br />

• informing relevant personnel and ag<strong>en</strong>cies (and providing contact details);<br />

• initiating and defining delimiting surveys (including supplem<strong>en</strong>tary trapping, <strong>th</strong>e frequ<strong>en</strong>cy<br />

<strong>of</strong> trap checking and <strong>th</strong>e amount <strong>of</strong> fruit sampling;<br />

• rapid id<strong>en</strong>tification <strong>of</strong> target fruit fly species;<br />

• eradication actions (chemical treatm<strong>en</strong>ts, use <strong>of</strong> sterile insect techniques, destruction<br />

<strong>of</strong> affected fruit etc.);<br />

• post-control monitoring (procedures and time scale);<br />

• implem<strong>en</strong>ting regulatory controls to prev<strong>en</strong>t movem<strong>en</strong>t <strong>of</strong> host material <strong>th</strong>rough or from<br />

susp<strong>en</strong>sion zone.<br />

3. Criteria for reinstatem<strong>en</strong>t <strong>of</strong> a FF-PFA after an outbreak and actions<br />

to be tak<strong>en</strong><br />

The criteria for determining <strong>th</strong>at eradication has be<strong>en</strong> successful should be determined and<br />

<strong>th</strong>e actions to be tak<strong>en</strong> may include:<br />

• no fu<strong>rt</strong>her detections <strong>of</strong> target fruit fly species after <strong>th</strong>e completion <strong>of</strong> control measures<br />

for a previously determined time period;<br />

• notification <strong>of</strong> appropriate ag<strong>en</strong>cies;<br />

• re-instatem<strong>en</strong>t <strong>of</strong> normal surveillance levels;<br />

• lifting susp<strong>en</strong>sions <strong>of</strong> host commodity movem<strong>en</strong>t.<br />

4. Notification <strong>of</strong> trading pa<strong>rt</strong>ners as appropriate<br />

Trading pa<strong>rt</strong>ners should be notified in a timely manner wh<strong>en</strong> susp<strong>en</strong>sions have be<strong>en</strong><br />

implem<strong>en</strong>ted or lifted. Timing <strong>of</strong> notifications may be detailed in bilateral arrangem<strong>en</strong>ts be<strong>tw</strong>e<strong>en</strong><br />

trading pa<strong>rt</strong>ners.<br />

67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!