Rep o rt of th e tw en - Rotterdam Convention
Rep o rt of th e tw en - Rotterdam Convention
Rep o rt of th e tw en - Rotterdam Convention
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2. Control measures in <strong>th</strong>e id<strong>en</strong>tified zones<br />
These may include:<br />
• setting <strong>th</strong>e time period for <strong>th</strong>e implem<strong>en</strong>tation and continued application <strong>of</strong> control<br />
measures;<br />
• determining and mapping <strong>th</strong>e relevant zones;<br />
• informing relevant personnel and ag<strong>en</strong>cies (and providing contact details);<br />
• initiating and defining delimiting surveys (including supplem<strong>en</strong>tary trapping, <strong>th</strong>e frequ<strong>en</strong>cy<br />
<strong>of</strong> trap checking and <strong>th</strong>e amount <strong>of</strong> fruit sampling;<br />
• rapid id<strong>en</strong>tification <strong>of</strong> target fruit fly species;<br />
• eradication actions (chemical treatm<strong>en</strong>ts, use <strong>of</strong> sterile insect techniques, destruction<br />
<strong>of</strong> affected fruit etc.);<br />
• post-control monitoring (procedures and time scale);<br />
• implem<strong>en</strong>ting regulatory controls to prev<strong>en</strong>t movem<strong>en</strong>t <strong>of</strong> host material <strong>th</strong>rough or from<br />
susp<strong>en</strong>sion zone.<br />
3. Criteria for reinstatem<strong>en</strong>t <strong>of</strong> a FF-PFA after an outbreak and actions<br />
to be tak<strong>en</strong><br />
The criteria for determining <strong>th</strong>at eradication has be<strong>en</strong> successful should be determined and<br />
<strong>th</strong>e actions to be tak<strong>en</strong> may include:<br />
• no fu<strong>rt</strong>her detections <strong>of</strong> target fruit fly species after <strong>th</strong>e completion <strong>of</strong> control measures<br />
for a previously determined time period;<br />
• notification <strong>of</strong> appropriate ag<strong>en</strong>cies;<br />
• re-instatem<strong>en</strong>t <strong>of</strong> normal surveillance levels;<br />
• lifting susp<strong>en</strong>sions <strong>of</strong> host commodity movem<strong>en</strong>t.<br />
4. Notification <strong>of</strong> trading pa<strong>rt</strong>ners as appropriate<br />
Trading pa<strong>rt</strong>ners should be notified in a timely manner wh<strong>en</strong> susp<strong>en</strong>sions have be<strong>en</strong><br />
implem<strong>en</strong>ted or lifted. Timing <strong>of</strong> notifications may be detailed in bilateral arrangem<strong>en</strong>ts be<strong>tw</strong>e<strong>en</strong><br />
trading pa<strong>rt</strong>ners.<br />
67