• Was this a case <strong>of</strong> design fault ?<br />

• No, because UBBL ’84 (& SBO ’94), permits<br />

<strong>the</strong> installation <strong>of</strong> a Downcomer system instead<br />

<strong>of</strong> a pressurized Wet Riser system<br />

• This has resulted in <strong>the</strong> lack <strong>of</strong> adequate water<br />

pressure for <strong>the</strong> upper floors where it is most<br />

needed in times <strong>of</strong> emergency<br />

• (Note that with or without <strong>the</strong> Downcomer<br />

system, <strong>the</strong> lower floors can be easily served by<br />

<strong>the</strong> Fire Tender)<br />

• The industry will sooner than later need to<br />

address this issue for a permanent solution