Part 2: During Construction Issue Yes No N/A Comments Initials Checks During Overlay Placement: A technical representative from the manufacturer is present to recommend the acceptability of all phases of the membrane operations. The Contractor places the waterproof membrane, primers and tack coats in accordance with the manufacturer’s specifications, instructions, and provisions. The type of membrane and tack being used matches specification requirements. Membrane placement only occurs at temperatures of 50 degrees F or higher. The membrane is placed to the extents indicated on the Plans, with sufficient overlap provided to ensure that water will not drain beneath the membrane. The temperature of the asphalt concrete mix complies with the mix design. The length of time the membrane can be exposed will not be exceeded before the Contractor places the asphalt overlay. Checks after Placement of Overlay Material: Overlay material is cured in the manner and for the time period required. Part 3: Post-Construction Issue Yes No N/A Comments Initials Overlay is the appropriate thickness. Overlay satisfies smoothness requirements. 102
Part 3: Post-Construction Issue Yes No N/A Comments Initials Contractor protects the deck against premature loading. 103
- Page 52 and 53: Figure 504:1. Photo. Sealing Forms
- Page 54 and 55: l. No oil or fuel leaks from machin
- Page 56 and 57: i. Ensure that the concrete is plac
- Page 58 and 59: 4. Miscellaneous (a) Deck Closure P
- Page 60 and 61: head being carried by the screed. T
- Page 62 and 63: Based on the above, the Inspector s
- Page 64 and 65: Opening a structure to traffic prio
- Page 66 and 67: hopper of the slipforming machine.
- Page 68 and 69: 4. Select the appropriate method of
- Page 70 and 71: . Calculated Quantity Option. This
- Page 72 and 73: B. Audit Requirements When pay item
- Page 74 and 75: Part 2: During Construction Issue Y
- Page 76 and 77: Part 2: During Construction Issue Y
- Page 78 and 79: Part 3: Post-Construction Issue Yes
- Page 80 and 81: HMA or in accordance with Section 4
- Page 82 and 83: 3. Asphalt Membrane Overlays For as
- Page 84 and 85: C. Construction Operations 1. Surfa
- Page 86 and 87: 8. Air temperatures will be in comp
- Page 88 and 89: 4. Membrane placement only occurs a
- Page 90 and 91: 9. Ensure that concrete is not drop
- Page 92 and 93: 6. Test concrete and discuss with t
- Page 94 and 95: 4. Check and document the surface t
- Page 96 and 97: j. Ensure that floor forms used to
- Page 98 and 99: plan quantity must be documented by
- Page 100 and 101: 4. Quality Control / Quality Assura
- Page 104 and 105: CHECKLIST - POLYMER CONCRETE OVERLA
- Page 106 and 107: Part 1: Preconstruction CHECKLIST -
- Page 108 and 109: Part 2: During Construction Issue Y
- Page 110 and 111: 506.01 GENERAL SECTION 506 - STRUCT
- Page 112 and 113: 3. Check of Bearing Seats A final c
- Page 114 and 115: and correction can be performed in
- Page 116 and 117: Figure 506:2. Photo. Diaphragm Inst
- Page 118 and 119: During final tightening, all of the
- Page 120 and 121: (c) Weather Restrictions Do not all
- Page 122 and 123: Figure 506:4. Photo. Pitted Welds i
- Page 124 and 125: values shall not exceed the higher
- Page 126 and 127: 4. Bearing Adjustment When steel be
- Page 128 and 129: features or gaps in the extents of
- Page 130 and 131: Figure 506:8. Photo. Sagging due to
- Page 132 and 133: Part 2: During Construction Issue Y
- Page 134 and 135: Part 3: Post-Construction Issue Yes
- Page 136 and 137: identifying mark or stamp will be p
- Page 138 and 139: If the centerline of the bearing do
- Page 140 and 141: Part 1: Preconstruction CHECKLIST -
- Page 142 and 143: B. Acceptance of Materials 1. Preca
- Page 144 and 145: 2. Curtain Walls Construction of cu
- Page 146 and 147: 6. Backfilling Culverts The Inspect
- Page 148 and 149: • Location or Structure Number an
- Page 150 and 151: 508.04 POST-CONSTRUCTION CONSIDERAT
Part 3: Post-Construction<br />
Issue Yes No N/A Comments Initials<br />
Contractor protects the deck against premature<br />
loading.<br />
103