04.04.2013 Views

City Sanitation Plan, Uttarakhand Detailed Plan report, Muni Ki Reti 1

City Sanitation Plan, Uttarakhand Detailed Plan report, Muni Ki Reti 1

City Sanitation Plan, Uttarakhand Detailed Plan report, Muni Ki Reti 1

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>Sanitation</strong> <strong>Plan</strong>, <strong>Uttarakhand</strong><br />

Year<br />

<strong>Detailed</strong> <strong>Plan</strong> <strong>report</strong>, <strong>Muni</strong> <strong>Ki</strong> <strong>Reti</strong><br />

Table 3.4 showing projected population of the town<br />

Camping & floating Population<br />

from Table no.1<br />

Increase in 15/20<br />

years<br />

2010 8208 -<br />

2025 10814 2606<br />

2040 13789 2975<br />

2060 15856 2067<br />

Table 3.5 showing Projection of Camping & Floating population for the year 2014, 2029, 2044<br />

Year<br />

Projection of floating &<br />

camping population<br />

& 2064<br />

Projected<br />

Population<br />

from table no.3<br />

Total<br />

Population<br />

Col.(2+3)<br />

1 2 3 5<br />

2014 2606x4/15+8208=8905 10490 19395<br />

2029 2975x4/15+10814=11607 13715 25322<br />

2044 12067x4/15+13789=14340 16870 31210<br />

2064 2067x4/20+15856=16270 19132 35402<br />

Above table has been prepared considering the population projection and growth rate in between the<br />

years and frequent flow of permanent population as well as camping/floating load of population of<br />

Rishikesh and nearby areas. The year of commencement of this project has been taken as 2014 the<br />

initial, 2029 middle and 2044 design year. Accordingly population has been projected for design<br />

purposes.<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!