03.04.2013 Views

4. description of the environment - Gujarat Pollution Control Board

4. description of the environment - Gujarat Pollution Control Board

4. description of the environment - Gujarat Pollution Control Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Final Feasibility Report<br />

Preparation <strong>of</strong> Feasibility– cum-Preliminary Design for 4/6 Laning<br />

<strong>of</strong> Jetpur-Somnath section <strong>of</strong> NH 8D, Package No:<br />

NHAI/DBFOII/DPR/02<br />

VOLUME III:<br />

ENVIRONMENTAL IMPACT ASSESSMENT<br />

5.2.1.11 Place <strong>of</strong> Consultation: Hanuman Shani Dev Mandir at Somnath<br />

The temple is Pucca Government structure about more than 300<br />

years old. Consultation was held with priest. He agreed for relocation<br />

<strong>of</strong> structure on area behind Somnath trust. However, government<br />

should take care <strong>of</strong> all expenses <strong>of</strong> relocation and shifting <strong>of</strong> utilities.<br />

5.3 PUBLIC HEARING (IN ACCORDANCE TO PROCEDURES<br />

OUTLINED IN THE MOEF NOTIFICATION SEPT 2006 & IT’S<br />

SUBSEQUENT AMENDMENTS)<br />

The project is category – A. Thus, <strong>the</strong> user agency (NHAI) had submitted application for Public<br />

Hearing to Regional Offices at two districts, namely Rajkot and Junagadh. The proceedings <strong>of</strong><br />

<strong>the</strong> Public Hearing is provided below.<br />

5.3.1 Public Hearing in Rajkot District<br />

<strong>Gujarat</strong> <strong>Pollution</strong> <strong>Control</strong> <strong>Board</strong>, Rajkot has published advertisement on 14 th November 2009 in<br />

<strong>Gujarat</strong>i daily namely “Sandesh” and “Divyabhaskar” and in English daily “Times <strong>of</strong> India” where<br />

in it was circulated for <strong>the</strong> general public that Public Hearing for <strong>the</strong> Project in Rajkot district shall<br />

be carried out at Group Kumar School, Village-Jetalsar, Taluka Jetpur, District Rajkot on 15 th<br />

December 2009 at 11:00 hr.<br />

The Project Proponent in coordination with GPCB, Rajkot had sent copy <strong>of</strong> <strong>the</strong> EIA Report along<br />

with Summary <strong>of</strong> <strong>the</strong> EIA (in English and Gujrati), Summary <strong>of</strong> <strong>the</strong> Project Report, Resettlement<br />

Action Plan (one hard copy and one s<strong>of</strong>t copy <strong>of</strong> each) to District Magistrate, Zila Parishad,<br />

District Industries Office, Regional <strong>of</strong>fice <strong>of</strong> MoEF and MoEF, New Delhi. In addition to this,<br />

Project Proponent in coordination with GPCB, Rajkot had also sent copy <strong>of</strong> <strong>the</strong> Summary <strong>of</strong> EIA<br />

in <strong>Gujarat</strong>i and in English to <strong>the</strong> village panchayat <strong>of</strong>fice <strong>of</strong> villages through which project corridor<br />

passes for wide publicity about <strong>the</strong> project.<br />

Mr Pankaj Thakar, Additional District Mangitrate, Rajkot, Mr S M Jha, Regional Officer, GPCB-<br />

Rajkot, Mr H K Bhatt, DGM cum Project Director, NHAI, PIU-Rajkot, Mr Mehul Bhatt, Manager-<br />

Tech, PIU-Rajkot Dr S D Badrinath, Environmental Expert, LASA (Consultant) and Mr Debashis<br />

Pal, Sr Manager (Environment) were present during <strong>the</strong> Public Hearing at <strong>the</strong> aforesaid venue on<br />

15 th December 2009.<br />

Mr Mehul Bhatt presented <strong>the</strong> project describing <strong>the</strong> proposed improvement, likely impacts due<br />

<strong>the</strong> project and mitigation measures proposed to minimize <strong>the</strong> anticipated impact, <strong>the</strong> land<br />

acquisition procedure and likely compensation package.<br />

The Public Hearing Proceedings (including <strong>the</strong> minutes) for Rajkot district is enclosed as<br />

Annexure-5.1.<br />

5-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!