4. description of the environment - Gujarat Pollution Control Board
4. description of the environment - Gujarat Pollution Control Board
4. description of the environment - Gujarat Pollution Control Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Final Feasibility Report<br />
Preparation <strong>of</strong> Feasibility– cum-Preliminary Design for 4/6 Laning<br />
<strong>of</strong> Jetpur-Somnath section <strong>of</strong> NH 8D, Package No:<br />
NHAI/DBFOII/DPR/02<br />
VOLUME III:<br />
ENVIRONMENTAL IMPACT ASSESSMENT<br />
S.No. Date/Venue <strong>of</strong> Consultation/Participants Issues Raised Remarks<br />
10.<br />
Farmer, Suresh Kumar Ranji Bhai- Contractor, Samaji,<br />
Paroshatam Bhai Valji-Farmer, Jetha Bhai Valji Bhai-<br />
Farmer, jethi Bhai Valji Bhai-farmer,Valabh Bhai<br />
Consultation at Village Shahpur in Junagadh<br />
29/11/2008 at village Supasi in District Junagadh in Gram<br />
Panchayat <strong>of</strong>fice- Jathua hera Bhai Arjan Bhai-Shop owner,<br />
Mahendra Hera Solanki, Dr. Ram Bhai Vasanth, Vasha<br />
Menji Vada, LAxman Vera Rathod, Devsi arsi Salank,<br />
Narang Jeeva Kheer, Chandera Atul Desha, Khimji Rana<br />
Baran, Vijay Gakad, Anil Harjivan Lohar, Ismail Jamal Patel,<br />
Arshi Mora Parmar, Naga Naran Ram, Hera Naran Ram,<br />
Naga Arjan Jatua, Pratap Baju Ram, Ismal Kesham Noor<br />
Bhai, Jawerkhar Daya Ghar, keshar Amar Sinh Luwar,<br />
Alarakha Asam Tavani, Ajit AMar Ajam, Ramesh Daya Ghar<br />
Bapu, Ala Rakha Puja, Pooja Nagajan Solanki, Abadrum<br />
Nathu, Hasan Bhaiji , Noor Bhai Maji, Hussain Bali Hisa<br />
Khani, Abraiman Jamal Hisa Khani, Gani Ala Rakha, Ismail<br />
Ala Rakha, Devath Sarman Jathua, Bhura Dada Roo,<br />
Rajshi Govind Jathua, Jayanthi Jayram, Veno Bhai<br />
Vanmadi, Hala Muslim Samaj, Garbi Mandal Supasi, Supasi<br />
Hindu Shanshan, Laxman Pooja, Desa Arjun Kharan, Vali<br />
Meeraji, Hatam Mikardi, Sidhi Hasann, Kishad Mirr, Kantha<br />
Pooja, Shashi Kant Karji, Pradeep Soonarwala<br />
Consultation at Village Supasi<br />
would result in huge loss <strong>of</strong><br />
irrigated land.<br />
The people also stated that <strong>the</strong><br />
compensation would vary from<br />
person to person as in people<br />
might demand for market price or<br />
land to land compensation.<br />
The people discussed that <strong>the</strong><br />
land had already been acquired<br />
by NHAI for <strong>the</strong> existing road and<br />
very les portion <strong>of</strong> land is<br />
available with <strong>the</strong> farmers that is<br />
falling in <strong>the</strong> bypass area. The<br />
people do not want any additional<br />
land acquisition fur<strong>the</strong>r as <strong>the</strong>y<br />
were not <strong>of</strong>fered fair<br />
compensation earlier too. The<br />
bypass alignment should be<br />
designed through a kutcha road<br />
that runs parallel to <strong>the</strong> existing<br />
road.<br />
The people viewed that <strong>the</strong> land<br />
should be taken from one end<br />
and not from <strong>the</strong> middle <strong>of</strong> <strong>the</strong><br />
land.<br />
The villagers opined that <strong>the</strong><br />
project will ensure better flow <strong>of</strong><br />
traffic, reduction <strong>of</strong> accident<br />
cases, increase in commercial<br />
activity and thus would be good<br />
for <strong>the</strong> development <strong>of</strong> <strong>the</strong> village.<br />
The villagers demanded an<br />
appropriate crossing from LHS to<br />
RHS, proper street lights, service<br />
roads, Government Bank,<br />
Hospital and a proper roundabout<br />
for <strong>the</strong> way to village Adri at <strong>the</strong><br />
existing Chokri. The people<br />
wanted that <strong>the</strong> existing facilities<br />
along <strong>the</strong> road should<br />
The villagers opposed <strong>the</strong><br />
development <strong>of</strong> an over bridge in<br />
<strong>the</strong> area and wanted fair<br />
compensation for <strong>the</strong> loss <strong>of</strong><br />
existing shop. The compensation<br />
would vary from person to person.<br />
The villagers were <strong>of</strong> <strong>the</strong> view that<br />
minimum width <strong>of</strong> <strong>the</strong> median<br />
should be considered. The<br />
median should have street lights<br />
on <strong>the</strong> entire stretch<br />
There is mosque and a graveyard<br />
that is falling along <strong>the</strong> road and<br />
<strong>the</strong> villagers stated that <strong>the</strong><br />
mosque should be considered<br />
during <strong>the</strong> design <strong>of</strong> <strong>the</strong> road as it<br />
could not be relocated.<br />
The Sarpanch was <strong>of</strong> <strong>the</strong> opinion<br />
that <strong>the</strong> project should be an<br />
Access controlled road a same as<br />
that <strong>of</strong> Jaipur-Bhilwada section.<br />
The road should have<br />
underpasses for <strong>the</strong> villagers to<br />
5-5