4. description of the environment - Gujarat Pollution Control Board
4. description of the environment - Gujarat Pollution Control Board 4. description of the environment - Gujarat Pollution Control Board
Final Feasibility Report Preparation of Feasibility– cum-Preliminary Design for 4/6 Laning of Jetpur-Somnath section of NH 8D, Package No: NHAI/DBFOII/DPR/02 VOLUME III: ENVIRONMENTAL IMPACT ASSESSMENT Therefore, in order to understand the socio-economic profile of the influence area of the project corridor, a micro-level analysis is essential. The aerial unit for analysis of the socio-economic profile of the influence area of the project corridor includes all traversed villages, urban and forest areas. Though the corridor passes through two administrative districts, for better appreciation, all socio-economic characteristics have been analyzed. 4.10 SOCIO-ECONOMIC PROFILE The socio-economic profile along the project corridor takes into account the social as well as the economic aspects: Population Distribution; Density of Population; Gender Ratio; Share of Vulnerable Groups and Literacy Rate Workforce Participation Ratio and Sector-wise Distribution of Workers 4.10.1 Population Distribution The project influence area comprises of 7 talukas falling under two districts namely Rajkot and Junagadh. The growth rate of population in the project influence area is 3.17 % which is higher than the average growth rate of population in the state (2.06%). The highest population growth rate is 4.66% recorded in Veraval taluka of Junagadh district followed by 4.46% in Junagadh taluka. In rest of the talukas, growth ranges between1% to 2%. Jetpur taluka of Rajkot district has registered the lowest growth rate of 0.77%. Talukawise demographic characteristics in project influence area are presented in Table 4-17 4-26
Final Feasibility Report Preparation of Feasibility– cum-Preliminary Design for 4/6 Laning of Jetpur-Somnath section of NH 8D, Package No: NHAI/DBFOII/DPR/02 Figure 4-12: Population Distribution VOLUME III: ENVIRONMENTAL IMPACT ASSESSMENT 4-27
- Page 1 and 2: 4. DESCRIPTION OF THE ENVIRONMENT T
- Page 3 and 4: Final Feasibility Report Preparatio
- Page 5 and 6: Final Feasibility Report Preparatio
- Page 7 and 8: Final Feasibility Report Preparatio
- Page 9 and 10: Final Feasibility Report Preparatio
- Page 11 and 12: Final Feasibility Report Preparatio
- Page 13 and 14: Final Feasibility Report Preparatio
- Page 15 and 16: Final Feasibility Report Preparatio
- Page 17 and 18: Final Feasibility Report Preparatio
- Page 19 and 20: Final Feasibility Report Preparatio
- Page 21 and 22: Final Feasibility Report Preparatio
- Page 23 and 24: Final Feasibility Report Preparatio
- Page 25: Final Feasibility Report Preparatio
- Page 29 and 30: Final Feasibility Report Preparatio
- Page 31 and 32: Final Feasibility Report Preparatio
- Page 33 and 34: Final Feasibility Report Preparatio
- Page 35 and 36: Final Feasibility Report Preparatio
- Page 37 and 38: Final Feasibility Report Preparatio
- Page 39 and 40: 5. PUBLIC CONSULTATION Public consu
- Page 41 and 42: Final Feasibility Report Preparatio
- Page 43 and 44: Final Feasibility Report Preparatio
- Page 45 and 46: Final Feasibility Report Preparatio
- Page 47 and 48: Final Feasibility Report Preparatio
- Page 49 and 50: Final Feasibility Report Preparatio
Final Feasibility Report<br />
Preparation <strong>of</strong> Feasibility– cum-Preliminary Design for 4/6 Laning<br />
<strong>of</strong> Jetpur-Somnath section <strong>of</strong> NH 8D, Package No:<br />
NHAI/DBFOII/DPR/02<br />
Figure 4-12: Population Distribution<br />
VOLUME III:<br />
ENVIRONMENTAL IMPACT ASSESSMENT<br />
4-27