Final Feasibility Report Preparation of Feasibility– cum-Preliminary Design for 4/6 Laning of Jetpur-Somnath section of NH 8D, Package No: NHAI/DBFOII/DPR/02 VOLUME III: ENVIRONMENTAL IMPACT ASSESSMENT Figure 4-10: Coastal Zone Locations along the Project Corridor 4.9 SOCIAL & CULTURAL ENVIRONMENT 4.9.1 Social Environment The project corridor passes through seven talukas and two Districts, namely Rajkot and Junagarh. 54 villages and 7 urban areas would be directly impacted, 5 in Rajkot and the remaining in Junagarh District. Details of each of the districts are presented in Table 4-16. Refer Annexure-4.1. Table 4-16: Number of Settlements along the Project Corridor S. No District Taluka Urban Village 1 Rajkot Jetpur 1 5 2 Junagadh Junagadh 1 19 Vanthali 1 7 Keshod 1 7 Malia 1 6 Mangrol 1 2 Patan- Veraval 1 10 Total 6 7 54 4-24
Final Feasibility Report Preparation of Feasibility– cum-Preliminary Design for 4/6 Laning of Jetpur-Somnath section of NH 8D, Package No: NHAI/DBFOII/DPR/02 VOLUME III: ENVIRONMENTAL IMPACT ASSESSMENT Figure 4-11: Number of Settlements along the Project Corridor 4-25
- Page 1 and 2: 4. DESCRIPTION OF THE ENVIRONMENT T
- Page 3 and 4: Final Feasibility Report Preparatio
- Page 5 and 6: Final Feasibility Report Preparatio
- Page 7 and 8: Final Feasibility Report Preparatio
- Page 9 and 10: Final Feasibility Report Preparatio
- Page 11 and 12: Final Feasibility Report Preparatio
- Page 13 and 14: Final Feasibility Report Preparatio
- Page 15 and 16: Final Feasibility Report Preparatio
- Page 17 and 18: Final Feasibility Report Preparatio
- Page 19 and 20: Final Feasibility Report Preparatio
- Page 21 and 22: Final Feasibility Report Preparatio
- Page 23: Final Feasibility Report Preparatio
- Page 27 and 28: Final Feasibility Report Preparatio
- Page 29 and 30: Final Feasibility Report Preparatio
- Page 31 and 32: Final Feasibility Report Preparatio
- Page 33 and 34: Final Feasibility Report Preparatio
- Page 35 and 36: Final Feasibility Report Preparatio
- Page 37 and 38: Final Feasibility Report Preparatio
- Page 39 and 40: 5. PUBLIC CONSULTATION Public consu
- Page 41 and 42: Final Feasibility Report Preparatio
- Page 43 and 44: Final Feasibility Report Preparatio
- Page 45 and 46: Final Feasibility Report Preparatio
- Page 47 and 48: Final Feasibility Report Preparatio
- Page 49 and 50: Final Feasibility Report Preparatio
Final Feasibility Report<br />
Preparation <strong>of</strong> Feasibility– cum-Preliminary Design for 4/6 Laning<br />
<strong>of</strong> Jetpur-Somnath section <strong>of</strong> NH 8D, Package No:<br />
NHAI/DBFOII/DPR/02<br />
VOLUME III:<br />
ENVIRONMENTAL IMPACT ASSESSMENT<br />
Figure 4-10: Coastal Zone Locations along <strong>the</strong> Project Corridor<br />
<strong>4.</strong>9 SOCIAL & CULTURAL ENVIRONMENT<br />
<strong>4.</strong>9.1 Social Environment<br />
The project corridor passes through seven talukas and two Districts, namely Rajkot and<br />
Junagarh. 54 villages and 7 urban areas would be directly impacted, 5 in Rajkot and <strong>the</strong><br />
remaining in Junagarh District. Details <strong>of</strong> each <strong>of</strong> <strong>the</strong> districts are presented in Table 4-16. Refer<br />
Annexure-<strong>4.</strong>1.<br />
Table 4-16: Number <strong>of</strong> Settlements along <strong>the</strong> Project Corridor<br />
S. No District Taluka Urban Village<br />
1 Rajkot Jetpur 1 5<br />
2 Junagadh Junagadh 1 19<br />
Vanthali 1 7<br />
Keshod 1 7<br />
Malia 1 6<br />
Mangrol 1 2<br />
Patan- Veraval 1 10<br />
Total 6 7 54<br />
4-24