4. description of the environment - Gujarat Pollution Control Board
4. description of the environment - Gujarat Pollution Control Board 4. description of the environment - Gujarat Pollution Control Board
Final Feasibility Report Preparation of Feasibility– cum-Preliminary Design for 4/6 Laning of Jetpur-Somnath section of NH 8D, Package No: NHAI/DBFOII/DPR/02 LEGEND: To Porbandar Existing Road Proposed Alignment Railway Line Taluka Boundary District Boundary River Air Quality Waterbody Forest JUNAGADH DISTRICT State Highway To Porbandar To Porbandar Kanza village (Ch. 61+200) Agatral village RF T-Juction (yogiraj motor) (Ch. 36+500) Vanthali village (Ch. 45+800) AQ-7 (Ch. 62+200) AQ-8 Panidhra village (Ch. 84+700) AQ-9 RAJKOT DISTRICT VOLUME III: ENVIRONMENTAL IMPACT ASSESSMENT T-Juction (jaydeep El.) (Ch. 27+000) AQ-5 AQ-6 Vivekanand Sillicate ind. Keshod Town T- Junction (Ch. 126+700) Jetpur Bypass (Ch. 0+100) Jetalsar high school (Ch. 24+900) AQ-3 AQ-10 AQ-4 Figure 4-6: Air Quality Monitoring stations AQ-1 (Ch. 7+900) AQ-2 GIRNAR RESERVE FOREST GIR RESERVE FOREST To Rajkot NH 8B To Bhavnagar 4-10
Final Feasibility Report Preparation of Feasibility– cum-Preliminary Design for 4/6 Laning of Jetpur-Somnath section of NH 8D, Package No: NHAI/DBFOII/DPR/02 The results of ambient air quality monitoring are as follows: Monitoring Location & Code Chainage (km) Jetpur Bypass 0+100 Jetalsar Highschool Vivekanand silicate Ind. T-Junction (Jaydeep Electricals) T-Junction (Yogiraj Motor) Vanthali Village VOLUME III: ENVIRONMENTAL IMPACT ASSESSMENT Table 4-7: Ambient Air Quality Results Pollutant Concentration (μg/m3) Location Area 24 hourly mean values Reference Category RSPM TSPM SO2 NO2 HC CO Start point of Jetpur Bypass after crossing Jetpur taking NH- 8B and near the junction where the road goes towards Jetpur City, near the Dye and Polymer Industry.* 7 + 900 Shops at Jetalsar Residential & Rural 24 + 900 27 + 000 36 + 500 Kanza Village 61 + 200 Agatrai Village 62 + 200 Panidhra Village Vivekananda Silicate Industry At the T Junction continuing from Jungadh Bypass where one road goes to Dhoraji on the RHS and and the other road goes to Junagadh city on LHS End of Junagadh Bypass at the T Junction where the road on RHS goes to Keshod and on the LHS goes to Jungadh City 45 + 800 Vanthili Junction* 84 +700 At the Junction near Kanza Village At the Junction near Agatrai Village* At the Junction near Panidhra Village Industrial 184.73 354.55 13.28 22.05 Nil 763 152.39 286.27 11.87 18.33 Nil 1526 Industries 121.89 230.05 9.02 13.67 Nil 1335 Residential & Rural Residential & Rural Residential & Rural Residential & Rural Residential & Rural Residential & Rural 190.63 399.92 16.95 28.4 Nil 1144 183.97 384.88 14.53 24.54 Nil 1526 159.04 287.44 15.7 22.86 Nil 1335 167.48 310.93 10.67 16.33 Nil 1526 170.84 327.85 12.27 20.02 Nil 1144 139.11 275.54 11.16 16.38 Nil 1716 4-11
- Page 1 and 2: 4. DESCRIPTION OF THE ENVIRONMENT T
- Page 3 and 4: Final Feasibility Report Preparatio
- Page 5 and 6: Final Feasibility Report Preparatio
- Page 7 and 8: Final Feasibility Report Preparatio
- Page 9: Final Feasibility Report Preparatio
- Page 13 and 14: Final Feasibility Report Preparatio
- Page 15 and 16: Final Feasibility Report Preparatio
- Page 17 and 18: Final Feasibility Report Preparatio
- Page 19 and 20: Final Feasibility Report Preparatio
- Page 21 and 22: Final Feasibility Report Preparatio
- Page 23 and 24: Final Feasibility Report Preparatio
- Page 25 and 26: Final Feasibility Report Preparatio
- Page 27 and 28: Final Feasibility Report Preparatio
- Page 29 and 30: Final Feasibility Report Preparatio
- Page 31 and 32: Final Feasibility Report Preparatio
- Page 33 and 34: Final Feasibility Report Preparatio
- Page 35 and 36: Final Feasibility Report Preparatio
- Page 37 and 38: Final Feasibility Report Preparatio
- Page 39 and 40: 5. PUBLIC CONSULTATION Public consu
- Page 41 and 42: Final Feasibility Report Preparatio
- Page 43 and 44: Final Feasibility Report Preparatio
- Page 45 and 46: Final Feasibility Report Preparatio
- Page 47 and 48: Final Feasibility Report Preparatio
- Page 49 and 50: Final Feasibility Report Preparatio
Final Feasibility Report<br />
Preparation <strong>of</strong> Feasibility– cum-Preliminary Design for 4/6 Laning<br />
<strong>of</strong> Jetpur-Somnath section <strong>of</strong> NH 8D, Package No:<br />
NHAI/DBFOII/DPR/02<br />
The results <strong>of</strong> ambient air quality monitoring are as follows:<br />
Monitoring<br />
Location &<br />
Code<br />
Chainage<br />
(km)<br />
Jetpur Bypass 0+100<br />
Jetalsar<br />
Highschool<br />
Vivekanand<br />
silicate Ind.<br />
T-Junction<br />
(Jaydeep<br />
Electricals)<br />
T-Junction<br />
(Yogiraj Motor)<br />
Vanthali<br />
Village<br />
VOLUME III:<br />
ENVIRONMENTAL IMPACT ASSESSMENT<br />
Table 4-7: Ambient Air Quality Results<br />
Pollutant Concentration (μg/m3)<br />
Location Area<br />
24 hourly mean values<br />
Reference Category<br />
RSPM TSPM SO2 NO2 HC CO<br />
Start point <strong>of</strong><br />
Jetpur Bypass<br />
after crossing<br />
Jetpur taking NH-<br />
8B and near <strong>the</strong><br />
junction where<br />
<strong>the</strong> road goes<br />
towards Jetpur<br />
City, near <strong>the</strong><br />
Dye and Polymer<br />
Industry.*<br />
7 + 900 Shops at Jetalsar Residential<br />
& Rural<br />
24 + 900<br />
27 + 000<br />
36 + 500<br />
Kanza Village 61 + 200<br />
Agatrai Village 62 + 200<br />
Panidhra<br />
Village<br />
Vivekananda<br />
Silicate Industry<br />
At <strong>the</strong> T Junction<br />
continuing from<br />
Jungadh Bypass<br />
where one road<br />
goes to Dhoraji<br />
on <strong>the</strong> RHS and<br />
and <strong>the</strong> o<strong>the</strong>r<br />
road goes to<br />
Junagadh city on<br />
LHS<br />
End <strong>of</strong> Junagadh<br />
Bypass at <strong>the</strong> T<br />
Junction where<br />
<strong>the</strong> road on RHS<br />
goes to Keshod<br />
and on <strong>the</strong> LHS<br />
goes to Jungadh<br />
City<br />
45 + 800 Vanthili Junction*<br />
84 +700<br />
At <strong>the</strong> Junction<br />
near Kanza<br />
Village<br />
At <strong>the</strong> Junction<br />
near Agatrai<br />
Village*<br />
At <strong>the</strong> Junction<br />
near Panidhra<br />
Village<br />
Industrial 18<strong>4.</strong>73 35<strong>4.</strong>55 13.28 22.05 Nil 763<br />
152.39 286.27 11.87 18.33 Nil 1526<br />
Industries 121.89 230.05 9.02 13.67 Nil 1335<br />
Residential<br />
& Rural<br />
Residential<br />
& Rural<br />
Residential<br />
& Rural<br />
Residential<br />
& Rural<br />
Residential<br />
& Rural<br />
Residential<br />
& Rural<br />
190.63 399.92 16.95 28.4 Nil 1144<br />
183.97 38<strong>4.</strong>88 1<strong>4.</strong>53 2<strong>4.</strong>54 Nil 1526<br />
159.04 287.44 15.7 22.86 Nil 1335<br />
167.48 310.93 10.67 16.33 Nil 1526<br />
170.84 327.85 12.27 20.02 Nil 1144<br />
139.11 275.54 11.16 16.38 Nil 1716<br />
4-11