03.04.2013 Views

APPLICANT PACKET - Virginia Department of Conservation and ...

APPLICANT PACKET - Virginia Department of Conservation and ...

APPLICANT PACKET - Virginia Department of Conservation and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Have sediment basins been installed where needed? (MS-6)<br />

Are all cut <strong>and</strong> fill slopes adequately stabilized? (MS-7)<br />

Are all on-site drainage channels <strong>and</strong> outlets adequately stabilized? (MS-8&9)<br />

Are all operational storm sewer inlets protected so that sediment will not enter the system?<br />

(MS-10)<br />

Have stormwater conveyance channels been adequately stabilized? (linings <strong>and</strong>/or outlet<br />

protection) (MS-11)<br />

Is there any work going on in live streams that may require stabilization or a temporary stream<br />

crossing? (MS-12, MS-13, MS-14)<br />

Are utility trenches backfilled, seeded, <strong>and</strong> dewatered properly? (MS-16)<br />

Is there any evidence <strong>of</strong> dirt or mud the road? (MS-17)<br />

Are there any structural practices that should be removed because they are no longer needed?<br />

(MS-18)<br />

Do any structural practices require repair or clean-out to maintain adequate function? (MS-18)<br />

Are properties <strong>and</strong> waterways downstream from development adequately protected from<br />

erosion <strong>and</strong> sediment damage due to increases in peak stormwater run<strong>of</strong>f? (MS-19)<br />

If violations <strong>of</strong> a plan or potentially hazardous situations are noted, they should be immediately<br />

reported to the Owner. The RLD may be able to suggest economical ways to achieve desirable<br />

corrections. In any case, it is wise to set a reasonable deadline for accomplishing necessary corrections.<br />

Plan changes or cases <strong>of</strong> non-compliance (such as commencing l<strong>and</strong> disturbance without an approved<br />

plan) should be addressed with the Plan-Approving Authority <strong>and</strong> Program Authority as appropriate.<br />

The common thread in any successful plan implementation is the need to reach timely solutions to<br />

issues that arise on site prior to <strong>and</strong> during plan implementation. By becoming knowledgeable in the<br />

<strong>Virginia</strong> ESC Program, developing a cooperative working relationship with on site parties, <strong>and</strong> exercising<br />

common sense, the RLD can facilitate efficient <strong>and</strong> economical plan implementation.<br />

Applicant Packet 20<br />

June 2001

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!