Final Remedial Action Completion Report for the ... - Rvaap.org
Final Remedial Action Completion Report for the ... - Rvaap.org
Final Remedial Action Completion Report for the ... - Rvaap.org
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Cmt.#<br />
A-3<br />
Page #<br />
Line #<br />
Section<br />
3.6.1, Pg<br />
3-12<br />
New Page<br />
or Sheet<br />
Pg 3-17,<br />
Section<br />
3.6.1,<br />
Line 18-<br />
20<br />
Comment<br />
The intent of multi-incremental<br />
sampling is to send in <strong>the</strong> entire<br />
sample collected. Was sending<br />
a maximum of 1 kilogram<br />
specified in <strong>the</strong> Work Plan and<br />
how often was it necessary to<br />
reduce <strong>the</strong> size of <strong>the</strong> MI<br />
sample?<br />
Shaw Environmental, Inc. 2 of 39<br />
Recommendation<br />
Response<br />
were determined based on risk-based<br />
and site-specific considerations,<br />
including background<br />
concentrations, duration of<br />
reasonable maximum human<br />
exposures, and reasonably<br />
anticipated future land use (National<br />
Guard mounted training, no<br />
digging). Attainment of <strong>the</strong> RAO<br />
addressed potential risks to human<br />
and ecological receptors identified in<br />
<strong>the</strong> risk assessment through removal<br />
of surface and subsurface soil and<br />
dry sediment with concentrations of<br />
COCs exceeding clean-up goals<br />
(Shaw 2007a). The clean-up goals<br />
implemented <strong>for</strong> <strong>the</strong> remediation of<br />
soils and dry sediment at LLs 1-4 as<br />
presented in <strong>the</strong> Interim ROD are<br />
included in Table 2-1.” Table 2-1<br />
will include a list of <strong>the</strong> COCs and<br />
associated cleanup goals.<br />
Clarify. The original intent in <strong>the</strong> Work Plan<br />
was to submit <strong>the</strong> entire multiincremental<br />
sample to <strong>the</strong> laboratory<br />
<strong>for</strong> processing; however, discussions<br />
with Test America during <strong>the</strong><br />
procurement process indicated that<br />
typically only 1 kg of soil is sent <strong>for</strong><br />
processing including samples<br />
submitted in <strong>the</strong> past by USACE.<br />
After collecting <strong>the</strong> required sample<br />
volume and homogenizing it in <strong>the</strong><br />
field, Shaw reduced <strong>the</strong> size of <strong>the</strong><br />
MI sample as best possible so that<br />
approximately only 1 kg of soil was<br />
collected <strong>for</strong> each MI area.<br />
Shaw will include a sentence at <strong>the</strong><br />