03.04.2013 Views

Final Remedial Action Completion Report for the ... - Rvaap.org

Final Remedial Action Completion Report for the ... - Rvaap.org

Final Remedial Action Completion Report for the ... - Rvaap.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RTC <strong>for</strong> Draft LL1-4 <strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong><br />

A-107 2 LL1 and LL3<br />

drawings<br />

A-108 Figure 1-2 RVAAP<br />

Facility Map<br />

to, but John Tesner was originally<br />

receiving <strong>the</strong>m and he is no longer with<br />

NGB. In all actuality, we (OHARNG) pull in<br />

<strong>the</strong> NGB as needed on review of<br />

documents. Additionally, most o<strong>the</strong>r<br />

contractors on <strong>the</strong> RVAAP project do not<br />

send copies of reports to NGB. There<strong>for</strong>e,<br />

I would recommend not sending <strong>the</strong><br />

documents to NGB.<br />

The dashed line marked as <strong>the</strong> “AOC<br />

Boundary” is incorrect. The AOC Boundary<br />

is currently placed at <strong>the</strong> load line fence<br />

line. The area enclosed in your “AOC<br />

Boundary” (if you decide to use this area<br />

instead of moving <strong>the</strong> dashed line to <strong>the</strong><br />

fence line) should be identified as<br />

something else such as “Extent of<br />

Removal <strong>Action</strong>”. For LL2 and LL4<br />

drawings, <strong>the</strong> line <strong>for</strong> <strong>the</strong> AOC boundary is<br />

at <strong>the</strong> fence line so I am okay with leaving<br />

that marked as “AOC Boundary.”<br />

As noted in Comment 2, check <strong>the</strong> areas<br />

highlighted as <strong>the</strong> AOC on this figure. AOC<br />

boundary is currently set at <strong>the</strong> fence line.<br />

Recommend changing <strong>the</strong> descriptor <strong>for</strong> <strong>the</strong><br />

yellow highlighted area (i.e. AOC under IRP<br />

/ JMC Use Area) as <strong>the</strong>se are not <strong>the</strong> only<br />

AOCs under <strong>the</strong> IRP. Change to something<br />

such as “AOCs included in <strong>Remedial</strong><br />

<strong>Action</strong>.”<br />

USACE concurrence, <strong>the</strong> document<br />

distribution list will be revised to not<br />

include any fur<strong>the</strong>r distribution to<br />

NGB unless specifically directed by<br />

USACE. Going <strong>for</strong>ward, only one<br />

copy of project documents will be<br />

<strong>for</strong>warded to Katie Elgin as <strong>the</strong> sole<br />

OHARNG/NGB representative.<br />

The AOC boundaries have been<br />

moved as requested on <strong>the</strong> drawings<br />

<strong>for</strong> LL1 and LL3 in <strong>the</strong> final.<br />

The AOC boundaries have been<br />

moved as requested on <strong>the</strong> drawing<br />

to be consistent with <strong>the</strong> LL1-LL4<br />

specific drawings. The text in <strong>the</strong><br />

legend regarding <strong>the</strong> AOCs has<br />

been revised to read: “AOCs<br />

covered under LL1-LL4 FPRI<br />

contract”.<br />

Shaw Environmental, Inc. 13 of 13 June 20, 2008