RTC <strong>for</strong> Draft LL1-4 <strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong><br />

Cmt.#<br />

Page #<br />

Line #<br />

Comment<br />

Recommendation<br />

Response<br />

A-18 Page 3-11, Line 22 Delete “and staked” be<strong>for</strong>e utilizing The text has been revised to read<br />

“were surveyed utilizing….”<br />

A-19 Page 3-12, Line 2 Add “and staked” at end of sentence The text has been revised to read<br />

A-20 Page 3-15, Table 3-2 Why only 7 samples on Arsenic? Please<br />

explain briefly here or cross reference<br />

in<strong>for</strong>mation on lines 12-20 on Page 3-16.<br />

A-21 Page 4-4, Table 4-1<br />

and Line 10, Page 4-5,<br />

Line 7<br />

A-22 Page 5-2, Section<br />

5.2.3.1<br />

Confirm total of Non-Hazardous Soils on<br />

Page 3-11 and make Table 4-1 and Line<br />

10 consistent with Page 3-11.<br />

Was <strong>the</strong> validation per<strong>for</strong>med on 10% of<br />

<strong>the</strong> received data?<br />

A-23 Drawing Load Line 1 AOC boundary on drawing should be<br />

current fenceline. Please move AOC<br />

boundary to fence.<br />

A-24 Drawing Load Line 3,<br />

“within one foot and staked.”<br />

The note under Table 3-2 has been<br />

revised to state: “*Based on limited<br />

data (only 7 samples submitted <strong>for</strong><br />

correlation) – See fur<strong>the</strong>r explanation<br />

on next page under “Arsenic”.<br />

See response to Comment A-17.<br />

Shaw validated 100% of <strong>the</strong><br />

received data <strong>for</strong> samples collected<br />

during <strong>the</strong> work prior to inclusion <strong>for</strong><br />

accuracy.<br />

The AOC boundary has been moved<br />

as requested on <strong>the</strong> drawing in <strong>the</strong><br />

final.<br />

Add “to” after this “drawing is”. Note 3 has been revised to say “The<br />

Note 3<br />

purpose of this drawing is to….”<br />

A-25 Drawing Load Line 3 AOC boundary on drawing should be<br />

The AOC boundary has been moved<br />

current fenceline. Please move AOC<br />

as requested on <strong>the</strong> drawing in <strong>the</strong><br />

boundary to fence.<br />

final.<br />

A-26 Drawing Load Line 4 AOC boundary on drawing should be<br />

The AOC boundary has been moved<br />

current fenceline. Please move AOC<br />

as requested on <strong>the</strong> drawing in <strong>the</strong><br />

boundary to fence.<br />

final.<br />

A-27 Drawing Load Line 4 There is a note next to Bldg G-1A that<br />

The note is a remnant from previous<br />

says “(3’)”. Please clarify what is meant. Is<br />

iterations of <strong>the</strong> drawing. It will be<br />

it a depth of excavation?<br />

deleted in <strong>the</strong> drawing included in<br />

<strong>the</strong> <strong>Final</strong> version.<br />

A-28 Appendix B Tables – In <strong>the</strong> Winklepeck Burning Ground RI,<br />

As requested, on Table B-1, values<br />

Table B1<br />

<strong>the</strong>re was no GW Analyses <strong>for</strong> explosives,<br />

under <strong>the</strong> column “RVAAP<br />

propellants, VOCs, SVOCs, etc. By<br />

Background” has been revised to “0”<br />

default, <strong>the</strong> concentrations should be set<br />

as requested <strong>for</strong> all analytes with <strong>the</strong><br />

to zero <strong>for</strong> background instead of “NS”.<br />

exception of metals. This has been<br />

Please change <strong>the</strong> Background<br />

carried throughout <strong>the</strong> entire B-1<br />

concentrations to reflect this. Metal<br />

background numbers do not need to be<br />

changed.<br />

table.<br />

A-29 Page 1 of 39, Table B- Change RVAAP Background to zero See response to Comment A-28.<br />