DRAFT COMPLETION REPORT FOR THE REMEDIATION OF SOILS and DRY SEDIMENTS AT LOAD LINES 1-4 (RVAAP 08-11) AT THE<br />
RAVENNA ARMY AMMUNITION PLANT, RAVENNA, OHIO<br />
COMMENT RESPONSE TABLE<br />
JUNE 19, 2008<br />
Page #<br />
Line #<br />
Comment<br />
Ohio EPA (Eileen Mohr)<br />
A-1 Cover and Title Page Change Title, add in “and Dry Sediments”<br />
be<strong>for</strong>e Remediation of Soils<br />
Recommendation<br />
Response<br />
The title will be changed to:<br />
“<strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong><br />
<strong>for</strong> <strong>the</strong> Remediation of Soils and Dry<br />
Sediments at RVAAP08-11 (Load<br />
Lines 1-4).<br />
A-2 CD Change title to match Cover and Title page The title will be changed to match<br />
<strong>the</strong> Cover and Title page.<br />
A-3<br />
A-4<br />
Disclaimer Statement<br />
page<br />
Contractor Statement<br />
of Independent<br />
Technical Review<br />
Remove Disclaimer Statement page <strong>for</strong><br />
<strong>the</strong> <strong>Final</strong> version.<br />
Need to make consistent with Cover and<br />
Title Page<br />
The disclaimer statement as been<br />
removed from <strong>the</strong> <strong>Final</strong> document.<br />
The title will be changed to match<br />
<strong>the</strong> Cover and Title page. See<br />
Comment A-2.<br />
A-5 List of Appendices Correct spelling of Construction The text has been revised to say<br />
Line 2<br />
“Construction”.<br />
A-6 Page 1-4, Line 18 Add “s” to foundation The text has been revised to say<br />
“foundations”.<br />
A-7 Page 2-2, Line 4 Add “<strong>Final</strong>” be<strong>for</strong>e Interim ROD The text has been revised to say<br />
“<strong>Final</strong> Interim ROD”.<br />
A-8 Page 2-3, Line 1 Add “<strong>Final</strong>” be<strong>for</strong>e Interim ROD The text has been revised to say<br />
“<strong>Final</strong> Interim ROD”.<br />
A-9 Page 2-3, Line 6 Add “<strong>Final</strong>” be<strong>for</strong>e Interim ROD The text has been revised to say<br />
“<strong>Final</strong> Interim ROD”.<br />
A-10 Page 3-1, Line 6 Change “plans” to “planned” The text has been revised to say<br />
“planned”.<br />
A-11 Page 3-2, Line 17 Change “excavations” to “excavation” The text has been revised to say<br />
A-12 Page 3-3, Lines 7-9 Add a statement that field data showed <strong>the</strong><br />
required stability prior to sampling<br />
(removed enough well volume to ensure a<br />
viable sample was collected,<br />
measurements had stabilized, etc.) and<br />
“excavation”.<br />
The text has been revised to say<br />
“Although unable to include in this<br />
report, <strong>the</strong> field measurement data<br />
was collected in accordance with<br />
Section 3.2.2 and indicated that <strong>the</strong><br />
Shaw Environmental, Inc. 1 of 13 June 19, 2008