<strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong><br />

June 2008<br />

Remediation of Soils and Dry Sediments at RVAAP 08-11 (LLs 1-4)<br />

Page 6-1<br />

6.0 CHRONOLOGY OF EVENTS<br />

Section 1.0 of this report contains a brief history of facility operations, site investigations, and<br />

remedial investigations per<strong>for</strong>med at LLs 1-4. A chronological summary of significant events<br />

and reports since <strong>the</strong> signing of <strong>the</strong> ROD is provided below in Table 6-1.<br />

Table 6-1<br />

Chronological Summary of Significant Events at Load Lines 1-4<br />

Date Event<br />

July 2007 ROD <strong>for</strong> Remediation of Soils at Load Lines 1-4 signed<br />

July 2007 <strong>Remedial</strong> <strong>Action</strong> Work Plan approved<br />

July – August 2007 Baseline groundwater samples collected<br />

August 2007 Mobilization and implementation <strong>for</strong> remediation<br />

activities at LLs 1-4<br />

January 2008 Demobilization <strong>for</strong> remediation activities at LLs 1-4<br />