<strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong><br />

June 2008<br />

Remediation of Soils and Dry Sediments at RVAAP 08-11 (LLs 1-4)<br />

Page 2-3<br />

environment during construction activities. Remediation activities per<strong>for</strong>med in accordance with<br />

<strong>the</strong> approved RAWP are discussed in fur<strong>the</strong>r detail in Section 3.0.<br />

2.3 POST-ROD CHANGES TO THE SELECTED REMEDY<br />

Since <strong>the</strong> signing of <strong>the</strong> <strong>Final</strong> Interim ROD in July 2007 and implementation of field activities,<br />

changes to <strong>the</strong> selected remedy have been initiated by USACE and <strong>the</strong> Base Realignment and<br />

Closure Division (BRACD). These changes consist of eliminating two activities that were<br />

contracted and to be per<strong>for</strong>med by Shaw following <strong>the</strong> completion of <strong>the</strong> remedial action:<br />

1. Post-construction groundwater monitoring<br />

2. Concrete slab maintenance<br />

2.3.1 Groundwater Monitoring<br />

In addition to excavation and off-site disposal, <strong>the</strong> selected remedy in <strong>the</strong> <strong>Final</strong> Interim ROD<br />

originally contained provisions <strong>for</strong> Shaw to per<strong>for</strong>m groundwater monitoring <strong>for</strong> five years at<br />

selected wells to monitor <strong>for</strong> potential impacts to groundwater from remedy implementation.<br />

USACE intends to remove this task from Shaw’s scope of work and anticipates per<strong>for</strong>ming it<br />

under <strong>the</strong> Facility-Wide Groundwater Monitoring Program (FWGWMP) or ano<strong>the</strong>r contract.<br />

Be<strong>for</strong>e this task was eliminated, baseline groundwater sampling was per<strong>for</strong>med by Shaw prior to<br />

construction activities and is discussed fur<strong>the</strong>r in Section 3.2.<br />

2.3.2 Concrete Slab Maintenance<br />

The selected remedy requires periodic monitoring of <strong>the</strong> concrete slabs that remain in place to<br />

ensure that <strong>the</strong> integrity of <strong>the</strong> slabs has not been compromised. The slabs provide adequate<br />

barriers to prevent precipitation from infiltrating to impacted soils beneath. BRACD has already<br />

contracted <strong>for</strong> removal of slabs and foundations at LL 2, 3, and 4. BRACD started slab and<br />

foundation removal in March 2008. Removal of <strong>the</strong> slabs and foundation will eliminate <strong>the</strong> need<br />

<strong>for</strong> routine maintenance as directed in <strong>the</strong> selected remedy.<br />