<strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong><br />

June 2008<br />

Remediation of Soils and Dry Sediments at RVAAP 08-11 (LLs 1-4)<br />

Page 2-2<br />

exceeding clean-up goals (Shaw 2007a). The clean-up goals implemented <strong>for</strong> <strong>the</strong> remediation of<br />

soils and dry sediment at LLs 1-4 as presented in <strong>the</strong> Interim ROD are included in Table 2-1.<br />

.<br />

Table 2-1<br />

COCs and Cleanup Goals <strong>for</strong> Soils and<br />

Dry Sediments at LLs 1-4<br />

COC<br />

Cleanup Goal<br />

(mg/kg)<br />

In<strong>org</strong>anics<br />

Aluminum 34,942<br />

Antimony 2,458<br />

Arsenic 31<br />

Barium 3,483<br />

Cadmium 109<br />

Chromium, hexavalent 16<br />

Manganese (surface soils a ) 1,800<br />

Manganese (subsurface soils b ) 3,030<br />

Lead<br />

Explosives<br />

1,995<br />

2,4,6-TNT 1,646<br />

RDX<br />

PCBs<br />

838<br />

Aroclor-1254<br />

SVOCs<br />

35<br />

Benz(a)anthracene 105<br />

Benzo(a)pyrene 10<br />

Benzo(b)fluoran<strong>the</strong>ne 105<br />

Dibenz(a,h)anthracene 10<br />

Notes:<br />

COC – Chemical of Concern<br />

mg/kg – milligram per kilogram<br />

PCB – Polychlorinated biphenyl<br />

SVOCs – Semi-volatile <strong>org</strong>anic compound<br />

TNT – Trinitrotoluene<br />

RDX - Cyclonite<br />

a Surface soil interval is from 0 to 1 foot below ground surface<br />

b Subsurface soil interval is greater than 1 foot below ground surface<br />

2.2 SUMMARY OF REMEDIAL ACTION WORK PLAN<br />

As required per <strong>the</strong> CERCLA process, Shaw prepared a <strong>Remedial</strong> <strong>Action</strong> Work Plan (RAWP)<br />

(Shaw 2007b) which presents <strong>the</strong> “means and methods” <strong>for</strong> executing <strong>the</strong> selected remedy in<br />

accordance with <strong>the</strong> <strong>Final</strong> Interim ROD. The RAWP was reviewed and approved by USACE,<br />

Ohio EPA, and <strong>the</strong> RVAAP prior to field implementation and outlines <strong>the</strong> construction<br />

methodologies <strong>for</strong> excavation, contamination control, and protection of <strong>the</strong> public and <strong>the</strong><br />

*** FINAL***