03.04.2013 Views

Final Remedial Action Completion Report for the ... - Rvaap.org

Final Remedial Action Completion Report for the ... - Rvaap.org

Final Remedial Action Completion Report for the ... - Rvaap.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong><br />

June 2008<br />

1.1 PURPOSE AND SCOPE<br />

Remediation of Soils and Dry Sediments at RVAAP 08-11 (LLs 1-4)<br />

Page 1-1<br />

1.0 INTRODUCTION<br />

Shaw Environmental, Inc. (Shaw) was contracted by <strong>the</strong> United States Army Corps of Engineers<br />

(USACE) Omaha District to per<strong>for</strong>m remediation activities associated with impacted soils and<br />

dry sediments in Load Lines 1, 2, 3 and 4 (LLs 1-4) at <strong>the</strong> Ravenna Army Ammunition Plant<br />

(RVAAP) under <strong>the</strong> Fixed-Price Remediation Insurance (FPRI) Indefinite Delivery/Indefinite<br />

Quantity Contract No. DACA45-03-D-0026. LLs 1-4 are cross-referenced in <strong>the</strong> Army<br />

Environmental Data Base-Restoration (AEDBR) as Area of Concern (AOC) site numbers<br />

RVAAP 08, 09, 10 and 11, respectively. Work by Shaw at <strong>the</strong> Ravenna facility in LLs 1-4 was<br />

per<strong>for</strong>med under Delivery Order 0001 of <strong>the</strong> above referenced contract and managed by <strong>the</strong><br />

USACE-Louisville District.<br />

The purpose of this <strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong> (RACR) is to describe <strong>the</strong> activities<br />

completed, document <strong>the</strong> post remediation conditions and summarize <strong>the</strong> results of <strong>the</strong> final field<br />

testing. The actions described in this document and per<strong>for</strong>med under this delivery order were<br />

conducted in accordance with <strong>the</strong> selected remedy as presented in <strong>the</strong> <strong>Final</strong> Interim Record of<br />

Decision (ROD) (Shaw 2007a) that outlines <strong>the</strong> construction methodologies <strong>for</strong> excavation<br />

approach, contamination control, and protection of <strong>the</strong> public and environment at <strong>the</strong> LLs 1-4<br />

locations.<br />

1.2 SITE DESCRIPTION AND BACKGROUND<br />

The RVAAP is located in nor<strong>the</strong>astern Ohio within Portage and Trumbull Counties,<br />

approximately 1.6 km (1 mile) northwest of <strong>the</strong> city of Newton Falls and 4.8 km (3 miles)<br />

east-nor<strong>the</strong>ast of <strong>the</strong> city of Ravenna (Figure 1-1). The facility is a parcel of property<br />

approximately 17.7 kilometers (11 miles) long and 5.6 kilometers (3.5 miles) wide bounded by<br />

State Route 5, <strong>the</strong> Michael J. Kirwan Reservoir, and <strong>the</strong> CSX System Railroad on <strong>the</strong> south;<br />

Garret, McCormick, and Berry roads on <strong>the</strong> west; <strong>the</strong> Norfolk Sou<strong>the</strong>rn Railroad on <strong>the</strong> north;<br />

and State Route 534 on <strong>the</strong> east (Figure 1-2).<br />

As of February 2006, a total of 20,403 acres of <strong>the</strong> <strong>for</strong>mer 21,683-acre RVAAP have been<br />

transferred to <strong>the</strong> United States Property and Fiscal Officer (USP&FO) <strong>for</strong> Ohio and<br />

subsequently licensed to <strong>the</strong> Ohio Army National Guard (OHARNG) <strong>for</strong> use as a training site.<br />

Currently, RVAAP consists of 1,280 acres in several distinct parcels scattered throughout <strong>the</strong><br />

confines of <strong>the</strong> Ravenna Training and Logistics Site (RTLS). RVAAP’s remaining parcels of<br />

land are located completely within <strong>the</strong> RTLS. RTLS did not exist when RVAAP was<br />

operational, and <strong>the</strong> entire 21,683-acre parcel was a government-owned, contractor-operated<br />

industrial facility.<br />

The RVAAP Installation Restoration Program (IRP) encompasses investigation and cleanup of<br />

past activities over <strong>the</strong> entire 21,683 acres of <strong>the</strong> <strong>for</strong>mer RVAAP; <strong>the</strong>re<strong>for</strong>e, references to <strong>the</strong><br />

RVAAP in this document are considered to be inclusive of <strong>the</strong> historical extent of <strong>the</strong> RVAAP,<br />

which is inclusive of <strong>the</strong> combined acreages of <strong>the</strong> current RTLS and RVAAP, unless o<strong>the</strong>rwise<br />

specifically stated. The Ohio Environmental Protection Agency (Ohio EPA) is <strong>the</strong> lead<br />

regulatory agency <strong>for</strong> <strong>the</strong> remediation conducted by <strong>the</strong> Army under <strong>the</strong> U.S. Department of<br />

Defense (DoD) IRP.<br />

*** FINAL***

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!