Cmt.#<br />

A-57<br />

A-58<br />

A-59<br />

Page #<br />

Line #<br />

GENERA<br />

L<br />

Section<br />

3.6.4, lines<br />

17, 32<br />

Sections<br />

3.8.1 and<br />

3.9<br />

Page 4-4,<br />

line 3<br />

New Page<br />

or Sheet<br />

Pg 3-19,<br />

Line 6<br />

Pg 3-19,<br />

Line 29<br />

Pg 3-20,<br />

Line 12,<br />

25 and 34<br />

Comment<br />

Did Shaw intend to state<br />

“…one of <strong>the</strong> following<br />

reasoning”? Suggest changing<br />

“;” to “:”.<br />

Revise line 32. Suggest<br />

deleting <strong>the</strong> semicolon after<br />

“metals”. Same comment <strong>for</strong><br />

Section 3.6.4.2, 3.6.4.3, and<br />

3.6.4.4.<br />

Section 3.8.1 states that Shaw<br />

applied seed to <strong>the</strong> completed<br />

areas “as best as possible” since<br />

remediation extended past <strong>the</strong><br />

normal growing season <strong>for</strong> <strong>the</strong><br />

required seed mixtures.<br />

Section 3.9 <strong>the</strong>n states that it is<br />

expected that future BRAC<br />

demolition will disturb areas<br />

previously backfilled and<br />

seeded by Shaw, and that<br />

restoration of <strong>the</strong>se areas<br />

following demolition will be<br />

addressed by <strong>the</strong> Army.<br />

The USACE generally agrees<br />

with <strong>the</strong> report text in this<br />

regard; however, ano<strong>the</strong>r site<br />

visit is anticipated to resolve<br />

<strong>the</strong> issue.<br />

Change operating contractor to<br />

“PIKA” throughout document.<br />

(PIKA = PIKA International,<br />

Shaw Environmental, Inc. 38 of 39<br />

Recommendation<br />

Response<br />

responses are included as part of this<br />

response to comment. Please see<br />

responses to comments A-1 through<br />

A-20.<br />

“;” will be replaced with “:” after <strong>the</strong><br />

word “reasoning”.<br />

“;” will be replaced with “:”<br />

following metals <strong>for</strong> <strong>the</strong> sections<br />

noted.<br />

Shaw anticipates returning to <strong>the</strong><br />

facility at <strong>the</strong> beginning of May<br />

2008 to seed areas that were not able<br />

to be seeded at <strong>the</strong> end of<br />

remediation activities last year.<br />

However, Shaw does not anticipate<br />

seeding or reseeding areas that were<br />

initially backfilled and seeded by<br />

Shaw and <strong>the</strong>n disturbed as a result<br />

of slab demolition activities. Shaw<br />

has previously provided <strong>the</strong> Army<br />

with documents showing areas to be<br />

reseeded.<br />

“MKM” will be changed to “PIKA”<br />

when referring to operating<br />

contractor throughout <strong>the</strong> document.