3.2.8, page<br />
3-5, line 15<br />
Section<br />
3.3.4<br />
Section<br />
3.3.6, line<br />
31 and<br />
Section<br />
New Page<br />
or Sheet<br />
Comment<br />
were identified in <strong>the</strong> baseline<br />
groundwater data table in<br />
Appendix B.<br />
Should “taken” be “sampled”?<br />
Check comma and semicolon<br />
usage.<br />
States that a NOT will not be<br />
submitted until all areas are<br />
stabilized and vegetation is<br />
established. Is Shaw not<br />
proposing to skip vegetation of<br />
those areas which are likely to<br />
be disturbed by <strong>the</strong> BRAC<br />
contractor during slab removal?<br />
Shaw may have to reassess<br />
timing of NOT submittal,<br />
particularly if seeding is<br />
delayed until after slab<br />
removals are complete.<br />
Recommendation<br />
<strong>Report</strong> text change is not needed.<br />
Regardless of who completes<br />
seeding, <strong>the</strong> NOT submittal should<br />
not occur until after final<br />
stabilization is complete.<br />
Response<br />
background concentrations have<br />
been included in <strong>the</strong> groundwater<br />
tables <strong>for</strong> comparison purposes.<br />
This section has been revised<br />
extensively to discuss results in<br />
comparison to <strong>the</strong> RVAAP criteria<br />
per comments by Rick Hockett.<br />
Shaw will issue text <strong>for</strong> review prior<br />
to issuing <strong>the</strong> Draft report.<br />
The NOI only covers activities<br />
per<strong>for</strong>med by Shaw as part of <strong>the</strong><br />
remediation action <strong>for</strong> <strong>the</strong> soils and<br />
dry sediments and does not address<br />
impacts to soils disturbed by o<strong>the</strong>rs.<br />
It was originally Shaw’s intention to<br />
restore all areas disturbed during<br />
remediation activities; however,<br />
Shaw does not consider itself to be<br />
responsible <strong>for</strong> excavation areas that<br />
were backfilled and reseeded and<br />
<strong>the</strong>n disturbed by <strong>the</strong> BRAC<br />
contractor per<strong>for</strong>ming slab removal.<br />
Shaw intends to return to <strong>the</strong><br />
outstanding areas requiring seeding<br />
at <strong>the</strong> beginning of May 2008 in<br />
order to take advantage of <strong>the</strong><br />
growing season. Once vegetation<br />
begins to establish itself, Shaw will<br />
submit <strong>for</strong> <strong>the</strong> NOT <strong>for</strong> those areas<br />
recently seeded and incorporate<br />
language in <strong>the</strong> NOT that o<strong>the</strong>r areas<br />
are considered complete by Shaw<br />
and since <strong>the</strong>re has been subsequent<br />
follow on work by <strong>the</strong> Army.<br />
Delete “-“ after “on”. “-“ after “on” will be deleted on this<br />
line.<br />