03.04.2013 Views

Final Remedial Action Completion Report for the ... - Rvaap.org

Final Remedial Action Completion Report for the ... - Rvaap.org

Final Remedial Action Completion Report for the ... - Rvaap.org

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cmt.#<br />

A-46<br />

Page #<br />

Line #<br />

27, 31, 33<br />

and 34<br />

Section<br />

3.2.3, line<br />

18<br />

New Page<br />

or Sheet<br />

Comment<br />

wells are not already<br />

existing. Would “baseline”<br />

or “existing” be a better<br />

word choice?<br />

• Line 31. Remove “-“ after<br />

<strong>the</strong> word “one”.<br />

• Line 33. Revise<br />

“redevelopment were<br />

accomplished…”<br />

A-47 General Was <strong>the</strong> “Ravenna full suite”,<br />

including pesticides and<br />

herbicides, analyzed <strong>for</strong> 10% of<br />

samples? Even if <strong>the</strong> results<br />

are in appendix, please address<br />

in <strong>the</strong> report text as well.<br />

A-48<br />

A-49<br />

Section<br />

3.2.8, lines<br />

22-23<br />

Section<br />

3.2.8<br />

Line 23-<br />

24<br />

Recommendation<br />

Response<br />

• Line 31: “-“ will be removed after<br />

<strong>the</strong> word “one” in line 31.<br />

• Line 33: This sentence will be<br />

revised to state”…redevelopment<br />

were completed as required….”<br />

• Line 34: reference to section<br />

4.3.3.3.11.1 in <strong>the</strong> Facility-Wide<br />

Sampling Plan is correct.<br />

Line 34. Reference to section<br />

4.3.2.3.11.1 is made. Please<br />

verify that this is correct.<br />

Change “<strong>for</strong>m” to “from”. “<strong>for</strong>m” will be changed to “from”.<br />

Understand <strong>the</strong> sentence, but it<br />

seems awkward. Would <strong>the</strong><br />

text read better if it stated that<br />

“..<strong>the</strong> purpose of <strong>the</strong> initial<br />

groundwater sampling<br />

activities was to identify<br />

presence of contaminants in<br />

groundwater prior to initiation<br />

of Shaw construction<br />

activities…”?<br />

It would be helpful of <strong>the</strong><br />

MCLs and secondary standards<br />

Shaw Environmental, Inc. 35 of 39<br />

Section 3.2.5 Field Quality Control<br />

Sampling Procedures states<br />

“Duplicate samples were collected at<br />

a frequency of 10% of <strong>the</strong> field<br />

sample collected”. This sentence<br />

will be revised to state “Duplicate<br />

samples <strong>for</strong> <strong>the</strong> full suite including<br />

pesticides and herbicides were<br />

collected at a frequency 10% of <strong>the</strong><br />

field samples collected.”<br />

Shaw will revise this sentence to<br />

state <strong>the</strong> following: “The purpose of<br />

<strong>the</strong> initial groundwater sampling<br />

activities was to identify presence of<br />

contaminants in groundwater prior<br />

to initiation of Shaw construction<br />

activities.”<br />

The MCLs, secondary standards,<br />

Region 9 PRGs and RVAAP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!