Final Remedial Action Completion Report for the ... - Rvaap.org
Final Remedial Action Completion Report for the ... - Rvaap.org
Final Remedial Action Completion Report for the ... - Rvaap.org
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Cmt.#<br />
A-36<br />
A-37<br />
A-38<br />
A-39<br />
A-40<br />
Page #<br />
Line #<br />
Page 2-1,<br />
lines 6 and<br />
7<br />
Page 2-1,<br />
line 19<br />
Section<br />
2.3, page<br />
2-2, lines<br />
1-6<br />
Section<br />
2.3.1, lines<br />
9-11<br />
Section<br />
2.3.2, lines<br />
14-19<br />
New Page<br />
or Sheet<br />
Comment<br />
Shaw has modified <strong>the</strong>m,<br />
please add Shaw logo/note<br />
with revision date.<br />
• Line 6: Is <strong>the</strong>re a typo after<br />
“U.S.C.”? Should <strong>the</strong><br />
character be “§”?<br />
• Line 7: Change “;” to “:”<br />
after <strong>the</strong> word “criteria”.<br />
Change “;” to “,” after <strong>the</strong> word<br />
“landfill”.<br />
No changes are necessary.<br />
USACE, Louisville, needs to<br />
issue a contract modification to<br />
de-scope <strong>the</strong> post-construction<br />
groundwater monitoring and<br />
slab maintenance; warranty<br />
period; and any de-scope related<br />
to seeding.<br />
States that USACE “has<br />
removed” <strong>the</strong> 5-year period of<br />
groundwater monitoring from<br />
Shaw’s scope of work.<br />
• Please revise <strong>the</strong> 1 st<br />
sentence of Section 2.3.2.<br />
Although <strong>the</strong> sentence is<br />
understood, it is a run-on.<br />
• Recommend revising<br />
<strong>the</strong> 2 nd sentence of Section<br />
2.3.2 to indicate that BRAC has<br />
already contracted <strong>for</strong> removal<br />
of slabs and foundations at LL<br />
2, 3, and 4. BRAC started slab<br />
and foundation removal in<br />
Shaw Environmental, Inc. 32 of 39<br />
Recommendation<br />
Please revise to state <strong>the</strong> USACE<br />
“intends” to remove this from<br />
Shaw’s scope of work, since <strong>the</strong><br />
contract modification has not yet<br />
been processed. It is scheduled to be<br />
completed by 30 April 08.<br />
Response<br />
• On line 6, <strong>the</strong> symbol “t” will be<br />
replaced with “§”.<br />
• On line 7, “;” will be changed to<br />
“;” after <strong>the</strong> word “criteria”.<br />
On line 19, “;” will be changed to<br />
“,” after <strong>the</strong> work “landfill”.<br />
The sentence will be revised to state<br />
<strong>the</strong> following: “USACE intends to<br />
remove this task from Shaw’s scope<br />
of work and anticipates per<strong>for</strong>ming<br />
it under <strong>the</strong> Facility-Wide<br />
Groundwater Monitoring Program<br />
(FWGWMP) or ano<strong>the</strong>r contract.”<br />
• The 1 st sentence of Section<br />
2.3.2 will be revised to state <strong>the</strong><br />
following: “The selected remedy<br />
requires periodic monitoring of <strong>the</strong><br />
concrete slabs that remain in place to<br />
ensure that <strong>the</strong> integrity of <strong>the</strong> slabs<br />
has not been compromised. The<br />
slabs provide adequate barriers to<br />
prevent precipitation from<br />
infiltrating to impacted soils<br />
beneath”.