Cmt.#<br />

A-34<br />

A-35<br />

Page #<br />

Line #<br />

Appendix<br />

A,<br />

Construction<br />

As-<br />

Built<br />

Drawings<br />

Appendix<br />

A,<br />

Construction<br />

As-<br />

Built<br />

Drawings<br />

New Page<br />

or Sheet<br />

Comment<br />

• The Construction As-Built<br />

Drawings in Appendix A do not<br />

appear to depict all <strong>the</strong> buildings<br />

at <strong>the</strong> Load Lines. For example,<br />

<strong>for</strong> Load Line 2, I do not see<br />

buildings DC-1, DB4VP1,<br />

DB4WN, DB4WS, DB10VP1,<br />

DB10VP2, DB20 (or is DB-20A<br />

<strong>the</strong> same as DB20?). Should<br />

building DA-21 be labeled as<br />

DB21? DB25? DA28?<br />

DA28A? DB29? 2-51? 2-<br />

51A?<br />

• Symbol <strong>for</strong> Antimony<br />

should be “Sb”.<br />

• RDX is identified as<br />

“cyclonite”, which differs<br />

from definition in acronym<br />

list. If this is common<br />

convention, however, it may<br />

remain as is.<br />

• The drawings identify<br />

preparer as USACE,<br />

Louisville District. Since<br />

Shaw Environmental, Inc. 31 of 39<br />

Recommendation<br />

Please check <strong>the</strong> drawings in<br />

Appendix A <strong>for</strong> presence of all<br />

buildings, as noted in building<br />

inventory maintained by BRAC (Irv<br />

Venger). Add any missing<br />

buildings to <strong>the</strong> drawings. If it is not<br />

intended to depict all load line<br />

buildings, because some are remote<br />

from <strong>the</strong> Shaw remediation areas,<br />

<strong>the</strong>n add a note of explanation to <strong>the</strong><br />

drawings. If Shaw needs a building<br />

inventory list, please request.<br />

Please check and revise all<br />

Appendix A drawings as needed.<br />

Response<br />

(RDX). This line has changed to<br />

Line 9 on Pg 1-4.<br />

The purposes of <strong>the</strong> drawings are to<br />

provide a reference of <strong>the</strong><br />

remediated areas in relation to<br />

<strong>for</strong>mer load line locations but not<br />

necessarily to every building<br />

location. Although, <strong>the</strong>se drawings<br />

are similar to <strong>the</strong> ones that have been<br />

used during <strong>the</strong> RI, FS and work<br />

plan preparation process per<strong>for</strong>med<br />

by Shaw and o<strong>the</strong>r contractors and<br />

<strong>the</strong> <strong>for</strong>mat has been previously<br />

approved by USACE and OhioEPA,<br />

we will add a note on each of <strong>the</strong> site<br />

drawings that states “These<br />

drawings are <strong>for</strong> remediation<br />

purposes only and may not include<br />

all current and <strong>for</strong>mer buildings in<br />

each load line”.<br />

For <strong>the</strong> buildings that appear on <strong>the</strong><br />

drawings, <strong>the</strong> building numbers (i.e.<br />

DB-20A and DA-21) appear<br />

consistent with past drawings<br />

prepared <strong>for</strong> each of <strong>the</strong> load lines<br />

by Shaw and o<strong>the</strong>r contractors.<br />

• The correct symbol <strong>for</strong><br />

Antimony “Sb” will be included in<br />

<strong>the</strong> drawings.<br />

• The definition in <strong>the</strong> acronym<br />

list references “cyclonite” which is<br />

an abbreviated version of<br />

“cyclotrimethyltrinitramine”.<br />

• Each drawing will be revised to<br />

incorporate <strong>the</strong> Shaw logo and<br />

revision date as requested.