03.04.2013 Views

Final Remedial Action Completion Report for the ... - Rvaap.org

Final Remedial Action Completion Report for the ... - Rvaap.org

Final Remedial Action Completion Report for the ... - Rvaap.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Remedial</strong> <strong>Action</strong> <strong>Completion</strong> <strong>Report</strong><br />

June 2008<br />

Remediation of Soils and Dry Sediments at RVAAP 08-11 (LLs 1-4)<br />

Page vii<br />

TABLE OF CONTENTS<br />

1.0 INTRODUCTION.......................................................................................................... 1-1<br />

1.1 Purpose and Scope...........................................................................................................1-1<br />

1.2 Site Description and Background ....................................................................................1-1<br />

1.2.1 Load Lines 1 - 4..................................................................................................1-5<br />

1.3 Nature and Extent of Contamination ...............................................................................1-5<br />

2.0 PROJECT DESCRIPTION .......................................................................................... 2-1<br />

2.1 Summary of Record of Decision......................................................................................2-1<br />

2.1.1 <strong>Remedial</strong> <strong>Action</strong> Objectives ...............................................................................2-1<br />

2.2 Summary of <strong>Remedial</strong> <strong>Action</strong> Work Plan .......................................................................2-2<br />

2.3 Post-ROD Changes to <strong>the</strong> Selected Remedy ...................................................................2-3<br />

2.3.1 Groundwater Monitoring ....................................................................................2-3<br />

2.3.2 Concrete Slab Maintenance ................................................................................2-3<br />

3.0 CONSTRUCTION ACTIVITIES ................................................................................ 3-1<br />

3.1 Premobilization................................................................................................................3-1<br />

3.1.1 Required Permits/Clearances..............................................................................3-1<br />

3.1.2 Traffic Coordination and Routing.......................................................................3-1<br />

3.1.3 Pre-Construction Survey.....................................................................................3-1<br />

3.1.4 Pre-Construction Meeting...................................................................................3-2<br />

3.2 Baseline Groundwater Sampling .....................................................................................3-2<br />

3.2.1 Well Redevelopment...........................................................................................3-2<br />

3.2.2 Field Measurements............................................................................................3-3<br />

3.2.3 Purging Methods.................................................................................................3-3<br />

3.2.4 Sample Collection...............................................................................................3-3<br />

3.2.5 Filtration Procedures...........................................................................................3-4<br />

3.2.6 Field Quality Control Sampling Procedures .......................................................3-4<br />

3.2.7 Decontamination Procedures ..............................................................................3-4<br />

3.2.8 Summary of Groundwater Sample Results.........................................................3-4<br />

3.2.8.1 Volatile Organic Compounds ................................................................3-5<br />

3.2.8.2 Semi-Volatile Organic Compounds.......................................................3-5<br />

3.2.8.3 Explosives and Propellants ....................................................................3-5<br />

3.2.8.4 In<strong>org</strong>anics ..............................................................................................3-6<br />

3.2.8.5 Pesticides and PCBs ..............................................................................3-7<br />

3.3 Mobilization and Site Preparation ...................................................................................3-7<br />

3.3.1 Temporary Facilities...........................................................................................3-8<br />

3.3.2 Sign Placement ...................................................................................................3-9<br />

3.2.2.1 Safety Signs ...........................................................................................3-9<br />

3.2.2.2 Traffic Control Signs .............................................................................3-9<br />

3.3.3 Site Security........................................................................................................3-9<br />

3.3.4 Erosion and Sediment Control............................................................................3-9<br />

3.3.5 Clearing and Grubbing......................................................................................3-10<br />

3.3.6 Source of Water Usage .....................................................................................3-10<br />

3.3.7 Dust Management.............................................................................................3-10<br />

3.3.8 Protection of Existing Monitoring Wells..........................................................3-11<br />

3.4 Excavation .....................................................................................................................3-11<br />

***FINAL***

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!