03.04.2013 Views

Responsive Access Small Cargo Affordable Launch (RASCAL ...

Responsive Access Small Cargo Affordable Launch (RASCAL ...

Responsive Access Small Cargo Affordable Launch (RASCAL ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cost Estimation:<br />

The cost estimation for this project was conducted using the NASA-Air Force<br />

Cost Mode (NAFCOM), with some inputs from the Transcost model [13]. NAFCOM<br />

with some Transcost cost estimating relationships was used to calculate the DDT&E as<br />

well as the TFU for the <strong>RASCAL</strong> vehicle.<br />

To compute the first stage vehicle costs the weights of each of the subsystems was<br />

entered into NAFCOM. Using weight based CERS of the form of equation 5.<br />

COST *<br />

B<br />

= CF * A Weight<br />

(5)<br />

Each of the subsystems of the design has its own coefficients A and B. Therefore the<br />

user of NAFCOM can manipulate the cost of the components by adjusting the CF or<br />

complexity factor. For the <strong>RASCAL</strong> baseline complexity factor of close to one were<br />

used for all subsystems except the avionics which typically uses a CF of approximately<br />

0.3. The resulting costs for the first stage are included as Figure 23.<br />

In Millions of $<br />

Wing Group<br />

Tail Group<br />

Body Group<br />

TPS Group<br />

Landing Gear<br />

Electrical Conversion &<br />

Dist.<br />

Hydraulic Systems<br />

Surface Control Actuation<br />

Avionics<br />

Environmental Control<br />

Personal Equipment<br />

Engines<br />

Total<br />

DDTE<br />

$ 149.82<br />

$ 53.55<br />

$ 198.70<br />

$ 96.18<br />

$ 20.40<br />

$ 44.34<br />

$ 31.98<br />

$ 121.78<br />

$ 126.67<br />

$ 20.58<br />

$ 33.21<br />

$ 583.00<br />

$ 2,931.00<br />

F-22 TFU ~ $345<br />

TFU<br />

$ 21.47<br />

$ 7.28<br />

$ 57.14<br />

$ 20.02<br />

$ 0.66<br />

$ 14.69<br />

$ 5.08<br />

$ 81.58<br />

$ 7.55<br />

$ 2.77<br />

$ 1.30<br />

$ 6.00<br />

$ 446.00<br />

DDTE<br />

Hydraulic Systems<br />

4%<br />

Electrical Conversion<br />

& Dist.<br />

6%<br />

TFU<br />

Avionics<br />

3%<br />

Surface Control<br />

Actuation<br />

38%<br />

Landing Gear<br />

2%<br />

Environmental<br />

Control<br />

1%<br />

Surface Control<br />

Actuation<br />

17%<br />

TPS Group<br />

13%<br />

Hydraulic Systems<br />

2%<br />

Electrical Conversion<br />

& Dist.<br />

7%<br />

Figure 23: Cost Breakdown for <strong>RASCAL</strong> 1st Stage.<br />

Wing Group<br />

21%<br />

Body Group<br />

29%<br />

Personal Equipment<br />

1% Wing Group<br />

10%<br />

Tail Group<br />

3%<br />

TPS Group<br />

9%<br />

Landing Gear<br />

0%<br />

31<br />

Tail Group<br />

7%<br />

Body Group<br />

26%

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!