02.04.2013 Views

Enquiry Specification for Wagon Tippler with Side Arm Charger and ...

Enquiry Specification for Wagon Tippler with Side Arm Charger and ...

Enquiry Specification for Wagon Tippler with Side Arm Charger and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Enquiry</strong> <strong>Specification</strong> <strong>for</strong> <strong>Wagon</strong> <strong>Tippler</strong> <strong>with</strong> <strong>Side</strong> <strong>Arm</strong> <strong>Charger</strong> <strong>and</strong> Associated works<br />

NRO/CON/WT/533<br />

GENERAL<br />

The following Technical <strong>Specification</strong> shall be read in conjunction <strong>with</strong> General<br />

Technical <strong>Specification</strong> (GTS) of Bhilai Steel Plant, SAIL <strong>and</strong> General<br />

<strong>Specification</strong>. If there are any provisions in this Technical <strong>Specification</strong>, which are<br />

at variance <strong>with</strong> the provisions of General Technical <strong>Specification</strong> (GTS) of Bhilai<br />

Steel Plant, SAIL <strong>and</strong> General <strong>Specification</strong>, the provisions in this Technical<br />

<strong>Specification</strong> shall take precedence.<br />

1.0 DOCUMENTS/ INFORMATION TO BE FURNISHED ALONGWITH<br />

OFFER.<br />

(i) Clear Scope of supply.<br />

(ii) Exclusions, if any.<br />

(iii) Type <strong>and</strong> quantity of oil, lubricants & consumables <strong>for</strong> initial fill till successful<br />

commissioning of equipment.<br />

(iv) List of Commissioning spares <strong>and</strong> start-up spares <strong>with</strong> unit rates.<br />

(v) List <strong>with</strong> unit rates of special tools <strong>and</strong> tackles, if any required.<br />

(vi) Price Schedule <strong>for</strong> equipment & erection work as per the <strong>for</strong>mat enclosed.<br />

(vii) List of recommended spare parts <strong>for</strong> 3 years trouble free operation <strong>and</strong><br />

maintenance along<strong>with</strong> unit rates as per the <strong>for</strong>mat enclosed in price schedule.<br />

(viii) Technical Data sheets duly filled by the vendor (blank data sheets enclosed).<br />

(ix) Weight of the equipment in Kgs.<br />

(x) Catalogues/ Leaflets <strong>and</strong> O&M Manuals.<br />

(xi) Copies of G. A. Drawing of the equipment/ System.<br />

(xii) Reference list of your Customers <strong>for</strong> the similar supply of items.<br />

(xiii) Quality Assurance Plan.<br />

(xiv) Unpriced Copy<br />

(xv) <strong>Wagon</strong> <strong>Tippler</strong> - PLC interface details <strong>for</strong> communication <strong>with</strong> main plant PLC.<br />

EPI – New Delhi Volume-2B, Rev.0 Page 2 of 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!