- Page 1: 2nd Edition, January 2006 Guideline
- Page 5: ENDORSEMENTS This guideline was dev
- Page 9: CHAPTER ONE ASPHALT AND HOT MIX ASP
- Page 12 and 13: almost entirely of bitumen. The bit
- Page 14 and 15: Emulsions are graded based on how q
- Page 16 and 17: publication of The Asphalt Institut
- Page 18 and 19: Table 1-4 PG Grades of Binders Spec
- Page 20 and 21: maximum aggregate size, but also th
- Page 23 and 24: CHAPTER TWO PAVEMENT DESIGN CONSIDE
- Page 25 and 26: ! Pit identification ! Bin combinat
- Page 27 and 28: Aggregate Test Property Fine Aggreg
- Page 29 and 30: · Asphalt binder grade (PG: 64-22,
- Page 31 and 32: The maximum performance period to b
- Page 33 and 34: 18k ESAL20 = 62,000 + 80R (2-1) Whe
- Page 35 and 36: SOIL SUPPORT CAPABILITY The ability
- Page 37 and 38: · It indicates a basic material pr
- Page 39 and 40: ! 100 percent of the material has t
- Page 41: Aggregate base provides a drainable
- Page 46 and 47: PAVEMENT THICKNESS DESIGN For this
- Page 48 and 49: TRAFFIC (ESALs) The destructive eff
- Page 50 and 51: ! The probability that the load app
- Page 52 and 53: The SN obtained from Figure 3-1 is
- Page 54 and 55: Table 3-7 Recommended Minimum Pavem
- Page 56 and 57: Step 3 - Determine 18K EDLA for ent
- Page 59: CHAPTER FOUR SUBGRADE AND AGGREGATE
- Page 62 and 63: using common construction procedure
- Page 64 and 65: Design If soil cement stabilization
- Page 66 and 67: OVER-EXCAVATION METHOD Expansive so
- Page 69 and 70: CHAPTER FIVE CONSTRUCTION OF HOT MI
- Page 71 and 72: There are many styles and types of
- Page 73 and 74: Because a uniform flow of properly
- Page 75 and 76: pulleys, chains, sprockets, and oth
- Page 77 and 78: Placement Equipment multiple drop s
- Page 79 and 80: CONSTRUCTION PRACTICES PREPARATION
- Page 81 and 82: 2. It stabilizes the fines and pres
- Page 83 and 84: Now with Superpave, the nominal max
- Page 85 and 86: density on both sides of the joint
- Page 87 and 88: Heat checking is a rather common oc
- Page 89 and 90: Others contractors experimented wit
- Page 91 and 92: esult. But, if evaporation is slow
- Page 93 and 94:
material. A yielding subgrade or ba
- Page 95:
Testing should generally be perform
- Page 99 and 100:
CHAPTER SIX GEOSYNTHETICS AND THEIR
- Page 101 and 102:
BARRIER FABRICS One school of thoug
- Page 103 and 104:
Too light an application rate could
- Page 105 and 106:
Most HMA mixes require rolling to c
- Page 107:
CHAPTER SEVEN HIGH TRAFFIC VOLUME I
- Page 110 and 111:
This chapter provides design and pr
- Page 112 and 113:
Figure 7-3 Consolidation in the Whe
- Page 114 and 115:
HOT MIX ASPHALT (HMA) THICKNESS The
- Page 116 and 117:
Separation fabrics used to separate
- Page 118 and 119:
PRODUCTION AND PLACEMENT At the sta
- Page 121 and 122:
PARKING LOT DESIGN GENERAL CONSIDER
- Page 123 and 124:
to be placed as a part of the pavem
- Page 125 and 126:
Planned stage construction is a mea
- Page 127:
3. It eliminates the need for costl
- Page 131 and 132:
CHAPTER NINE DESIGNS FOR RECREATION
- Page 133 and 134:
The surface course, or the full-dep
- Page 135 and 136:
HMA THICKNESS Subgrade Type Class C
- Page 137:
CONSTRUCTION PRACTICES Construction
- Page 141 and 142:
LIFE CYCLE COST ANALYSIS Introducti
- Page 143 and 144:
Future cost and benefit streams sho
- Page 145:
and are updating to provide a more
- Page 149 and 150:
PAVEMENT MANAGEMENT CHAPTER ELEVEN
- Page 151 and 152:
The objective of this chapter is to
- Page 153 and 154:
The year specified for proposed mai
- Page 155 and 156:
It is important that pavements are
- Page 157 and 158:
Pavement maintenance also involves
- Page 159 and 160:
later than those receiving only sur
- Page 161 and 162:
5. Backfill with the asphalt mixtur
- Page 163:
Overlay Thickness ~ HMA overlays ma
- Page 167 and 168:
CHAPTER TWELVE PAVEMENT REHABILITAT
- Page 169 and 170:
and tear when operated on smooth pa
- Page 171 and 172:
Salvaged materials, whether previou
- Page 173 and 174:
HOT IN-PLACE REPAVING This process
- Page 175:
$ Seat cracked pieces. $ Remove and
- Page 179 and 180:
CHAPTER THIRTEEN PAVEMENT MANAGEMEN
- Page 181 and 182:
5. Implementation and Record Keepin
- Page 183 and 184:
protected against normal deteriorat
- Page 185 and 186:
The absolute value assigned by the
- Page 187 and 188:
Table 13-3 Maintenance Alternatives
- Page 189 and 190:
pavement areas. More sealant is not
- Page 191 and 192:
3. Durability. Well-designed, well-
- Page 193:
CHAPTER FOURTEEN TROUBLESHOOTING AN
- Page 196 and 197:
DURING PAVING At the start of pavin
- Page 198 and 199:
well as pavement failures in genera
- Page 200 and 201:
1.Physical Data (Information alread
- Page 202 and 203:
$ Samples of the base and subgrade
- Page 205 and 206:
APPENDIX A ASPHALT BINDER GRADE SEL
- Page 207 and 208:
Pavement Temperature Selection Cont
- Page 209 and 210:
References: Additional, more detail
- Page 211 and 212:
Table A-10 Traffic Flow Grade Bumpi
- Page 213:
APPENDIX B MGPEC Form #9
- Page 217:
Appendix C Web Site Address Organiz