Pressure tests<br />

All blowout prevention components that<br />

my be exposed to well pressure should<br />

be tested first to a low pressure of 1,38<br />

to 2,1 MPa (200 to 300 psi) and then to<br />

a high pressure.<br />

When performing the low pressure test, do<br />

not apply a higher pressure and bleed<br />

down to the low test pressure.<br />

A stable low test pressure should be<br />

maintained for at least 5 minutes.