Burnham Beeches Management Plan 2010 - the City of London ...
Burnham Beeches Management Plan 2010 - the City of London ...
Burnham Beeches Management Plan 2010 - the City of London ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4.3.2 Tree safety<br />
Tree safety is a legal obligation and all<br />
inspections and subsequent work must be<br />
carried out within <strong>the</strong> required time span. The<br />
tree safety policy gives detailed information on<br />
how this must be achieved.<br />
Target: ensure all tree safety issues are<br />
identified and dealt with effectively.<br />
Achieved by: ensuring all tree safety<br />
surveys and subsequent work is carried out<br />
on time as required by annually reviewed<br />
<strong>Burnham</strong> <strong>Beeches</strong> tree safety policy<br />
(according to <strong>City</strong> <strong>of</strong> <strong>London</strong> standards).<br />
4.3.3 Bats<br />
All bats and <strong>the</strong>ir roosts are protected. It is<br />
necessary to carry out inspections <strong>of</strong> all trees<br />
prior to any surgery or felling to ensure<br />
compliance with <strong>the</strong> law. General bat surveys<br />
should be carried out to ensure that <strong>the</strong> best<br />
information is available about where and how<br />
bats are using <strong>Burnham</strong> <strong>Beeches</strong>. Carry out<br />
surveys before work on trees and make<br />
improvements to bat habitat where possible.<br />
See <strong>the</strong> bat policy for more information.<br />
Target: to prevent any harm to bats or<br />
<strong>the</strong>ir roosts.<br />
Achieved by: implementing <strong>the</strong> bat policy.<br />
4.3.4 Fencing and gates<br />
Regular maintenance <strong>of</strong> infrastructure such as<br />
fences, gates, cattle grids, water troughs and<br />
associated equipment is required to keep<br />
livestock enclosed and healthy. All gates should<br />
be safe and appropriate for use.<br />
Target: to ensure all livestock<br />
infrastructure is appropriate and in good<br />
condition.<br />
Achieved by: regular checks and updating<br />
when necessary.<br />
4 objectives & actions - estate assets & legal issues<br />
4.3.5 External accreditation<br />
Reviewing <strong>the</strong> success <strong>of</strong> our work is not only<br />
important to ensure that <strong>the</strong> management<br />
remains <strong>of</strong> high quality. It is also important that<br />
we continue to lead <strong>the</strong> way in sustainable<br />
practices.<br />
Target: retain Green Flag and Green<br />
Heritage awards annually.<br />
Achieved by: applying for Green Flag or a<br />
similar benchmark each year; completing<br />
Corporate Sustainability Sudit system as<br />
per <strong>the</strong> agreed timetable (or applying for<br />
equivalent accreditation) and implementing<br />
<strong>the</strong> associated improvement plan.<br />
39