STAR*NET V6 - Circe
STAR*NET V6 - Circe
STAR*NET V6 - Circe
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter 5 Preparing Input Data<br />
Example Interconnected 2D Traverses<br />
This example illustrates a small project with two interconnected 2D traverses. The first<br />
traverse begins with a fixed bearing, and has known coordinates at each end. The second<br />
traverse begins on the first traverse, and ends at the same station the first traverse ended,<br />
and with a closing angle turned to another station. An extra distance tie measured<br />
between the traverses adds some redundancy.<br />
# Sample Multi-Loop Traverse Data<br />
#<br />
C 1 5000.00 5000.00 ! !<br />
C 5 4427.12 7245.55 ! !<br />
#<br />
TB N45-30-40W # Backsight to fixed bearing<br />
T 1 123-40-28 537.52<br />
T 2 217-11-37 719.56<br />
T 3 113-52-15 397.66<br />
T 4 260-19-24 996.23<br />
TE 5 # End traverse at 5<br />
#<br />
TB 1 # Backsight to 1<br />
T 2 120-11-12 473.25<br />
T 6 -101-32-30 625.76<br />
T 7 198-13-09 533.66<br />
T 8 172-07-27 753.22<br />
T 9 -84-32-20 661.01<br />
TE 5 -73-02-46 4 # End, turn angle to 4<br />
#<br />
D 4-8 361.30 # Extra distance tie<br />
N 4 5 - 3 0 - 0 0 W<br />
1<br />
124°<br />
5 3 7 .5 2<br />
120°<br />
4 7 3 .2 5<br />
2<br />
6<br />
217°<br />
102°<br />
6 25 .7 6<br />
7 1 9 .5 6<br />
114°<br />
Sample Multiple Traverse Data<br />
3<br />
70<br />
7<br />
198°<br />
3 9 7 .6 6<br />
533 .66<br />
1<br />
260°<br />
6 .3 3<br />
4<br />
8<br />
9 9 6 .2 3<br />
172°<br />
7 5 3 .2 2<br />
73°<br />
5<br />
85°<br />
6 6 1 .0 1<br />
9