27.03.2013 Views

STAR*NET V6 - Circe

STAR*NET V6 - Circe

STAR*NET V6 - Circe

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Option Group: Units<br />

Chapter 4 Options<br />

Select both linear and angular units for your project. Select linear units from the<br />

dropdown selection list, and angular units from the DMS or GONS radio buttons.<br />

Adjustment results are always published using the selected units. By default, your input<br />

data is assumed to be entered in these units.<br />

An inline “.UNITS” option, however, may be used in your data to allow entry of<br />

measurements in other units. Measurements entered in these alternate units are<br />

automatically converted to the units set for the project during the run.<br />

Option Group: Coordinate System<br />

Select the coordinate system used in the adjustment.<br />

When you select “Local,” your input and output coordinates are based on some local<br />

scheme. The method used to scale your input distance observations to produce the<br />

desired local coordinates is set in the “Local Jobs - Default Datum Scheme” adjustment<br />

options described later in this section.<br />

When you select “Grid,” your input and output coordinates are based on some defined<br />

grid system. Published geodetic calculations are rigorously employed in the adjustment<br />

process to produce properly calculated grid coordinates and geodetic positions. You can<br />

choose from several grid systems: NAD27, NAD83, UTM and Custom:<br />

Once you select a grid system, you can then select a specific zone from a dropdown list.<br />

The zone list selection dialogs for NAD27, NAD83, UTM and Custom grid systems, the<br />

definition of Custom Zones, and special input issues for grid projects are discussed in<br />

detail in Chapter 10, “Adjustments in Grid Coordinate Systems.”<br />

Option Group: 2D Jobs<br />

When an adjustment is 2D, an average project elevation should always be entered so that<br />

certain data reduction calculations (i.e. slope reduction of 3D observations to horizontal)<br />

can be accurately performed using curved earth-geometry for both local and grid jobs. In<br />

addition, when adjusting a local job, and you wish to have data reduced to a common<br />

datum as described in the next option group, an average project elevation must be<br />

known. Likewise, for a grid job, an average project elevation must also be available to<br />

calculate proper grid factors. For some additional elevation-related issues for 2D jobs,<br />

see “Entering Reference Elevations in 2D Projects” in Chapter 5, “Preparing Data.”<br />

An inline “.PELEVATION” option may be entered in data files to redefine the default<br />

project elevation for various parts of a 2D project when you feel it is necessary.<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!