Lock-N-Load AP - Hornady
Lock-N-Load AP - Hornady
Lock-N-Load AP - Hornady
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Step 7: Automatic Primer Feed Inspection<br />
It is not necessary to install the primer tubes at this time to test your loader, but you must install the Primer<br />
Body (14). Lower the Prmer Slide so that is stays in place. See step 4A for instructions on installing the Primer<br />
Body (14).<br />
At this point you should have installed a Shell Plate and the corresponding Primer Seater Punch (26) and<br />
Primer Slide (15) for the cartridge for which you are loading.<br />
Step 8: Installing the <strong>Lock</strong>-N-<strong>Load</strong> Powder Measure with Case Activated Powder Drop.<br />
Figure 6: <strong>Lock</strong>-N-<strong>Load</strong> Powder Measure<br />
UPPER ASSEMBLY<br />
MEASURE AD<strong>AP</strong>TER<br />
The <strong>Lock</strong>-N-<strong>Load</strong> Powder Measure combines with the Case Activated Powder Drop to mount on-top of the <strong>Lock</strong>-<br />
N-<strong>Load</strong> A/P in station 2 or 3. The L-N-L Powder Measure that was shipped with the press has been factory fitted<br />
with the case activiated Powder Drop.<br />
* This press comes packaged with the Standard Rotor & Standard Metering Insert and the Pistol Rotor & Pistol Metering Insert.<br />
Refer to the <strong>Lock</strong>-N-<strong>Load</strong> Powder Measure and Case Activated Powder Drop instructions for cleaning and<br />
functionality. (These instructions are included).<br />
- 13 -<br />
STATION 1<br />
STATION 2