DuraPlate Repair Manual - Wabash National Corporation
DuraPlate Repair Manual - Wabash National Corporation DuraPlate Repair Manual - Wabash National Corporation
DuraPlate Repair Manual iv Notes ®
® Shiplap DuraPlate Panel Change SECTION 1 SHIPLAP DURAPLATE PANEL CHANGE Introduction This procedure addresses replacing DuraPlate Shiplap side panels on Wabash National Dry Freight Vans. It provides a step-by-step repair procedure with detailed drawings, descriptive photographs, a recommended list of materials, and tool requirements. Labor Requirements Replacing a DuraPlate side panel requires three qualified mechanics using the proper tools and equipment, as outlined in this procedure. This procedure is written based on a proven shop practice for replacing a single DuraPlate Shiplap side panel. With these instructions, potential areas of concern, such as how to safely remove a panel without damaging adjacent panel seams, can be addressed safely and efficiently. CAUTION: People who work with DuraPlate side panels are advised to always use proper ANSI safety equipment, including: safety glasses, hearing protection, cut-resistant gloves, steel-toed shoes, knee pads, face shields, etc. 1-1
- Page 1 and 2: DuraPlate ® Repair Manual 2004 Tra
- Page 3 and 4: ® General Safety Guidelines DuraPl
- Page 5: ® DuraPlate Repair Manual Section
- Page 9 and 10: ® Tools and Equipment Required Shi
- Page 11 and 12: ® Separating the Scuff Liner Shipl
- Page 13 and 14: ® Shiplap DuraPlate Panel Change 2
- Page 15 and 16: ® Shiplap DuraPlate Panel Change 3
- Page 17 and 18: ® Figure 1-7, Cutting the New Pane
- Page 19 and 20: ® Shiplap DuraPlate Panel Change 4
- Page 21 and 22: ® Shiplap DuraPlate Panel Change C
- Page 23 and 24: ® Shiplap DuraPlate Panel Change F
- Page 25 and 26: ® RUBBER CUSHION 1/8" PAD 2-5/8" 1
- Page 27 and 28: ® SEAM ONLY BRV00160 1/4 D x 13/16
- Page 29 and 30: ® Logistic DuraPlate Panel Change
- Page 31 and 32: ® Tools and Equipment Required Log
- Page 33 and 34: ® Figure 2-1, Removing the Scuff L
- Page 35 and 36: ® Figure 2-3, Removing the Vertica
- Page 37 and 38: ® Logistic DuraPlate Panel Change
- Page 39 and 40: ® Logistic DuraPlate Panel Change
- Page 41 and 42: ® Temporarily Tacking the New Pane
- Page 43 and 44: ® Completing the Riveting Process
- Page 45 and 46: ® Reinstalling the Scuff Liner Log
- Page 47 and 48: ® Logistic DuraPlate Panel Change
- Page 49 and 50: ® Logistic DuraPlate Panel Change
- Page 51 and 52: ® BRV00170 1/4"D x 5/8"L UNIVERSAL
- Page 53 and 54: ® Logistic DuraPlate HD Dry Freigh
- Page 55 and 56: ® Tools and Equipment Required Log
<strong>DuraPlate</strong> <strong>Repair</strong> <strong>Manual</strong><br />
iv<br />
Notes<br />
®