ICHCA International <strong>Safe</strong>ty Panel Briefing Pamphlet No 30<br />
A6.2.4 In Service<br />
It is possible that the seal will be compacted during transport; this could be<br />
caused by vibration or the properties <strong>of</strong> the seal material. Should this<br />
happen then there is a risk that the seal will be broken thus increasing the<br />
risk <strong>of</strong> the cargo or its vapours escaping. If this should happen then the<br />
swing bolts should be re-tightened.<br />
A6.2.5 Maintenance<br />
A6.2.5.1 Once per year the manway lid mechanism and dimensions should be<br />
checked as follow:<br />
A6.3 <strong>Safe</strong>ty<br />
Manway lid and neck ring thicknesses<br />
The actual thickness shall remain over the minimum calculation<br />
thickness after potential corrosion. The values shown below are<br />
typical:<br />
Minimum manway lid thickness: 4.4 mm (5 mm at time <strong>of</strong> delivery)<br />
Minimum neckring thickness: 7.5 mm (8 mm at time <strong>of</strong> delivery)<br />
Welding visual check<br />
No crack should show on swing bolts bracket attachments, fillets and<br />
on the circular weld between collar and neckring<br />
Seal tightness check<br />
Replace gasket if necessary<br />
Swing bolt threads check<br />
Replace the swing bolts if the threads are scratched or elongated<br />
Pressure test inspection<br />
According to tank standards requirements<br />
A6.3.1 All valves, ports and access lids must be properly closed once filling has<br />
been completed.<br />
A6.3.2 Manway lids are a major cause <strong>of</strong> leaks due to improper fitting <strong>of</strong> the seal,<br />
incorrectly tightening swing bolts or swing bolts that have loosened during<br />
transport. The structure <strong>of</strong> a tank container can survive a drop from height,<br />
but if it lands upside down and the manway lid is not tightened correctly<br />
there will be a serious risk <strong>of</strong> the cargo escaping.<br />
A6.3.3 If there is any doubt about the integrity <strong>of</strong> any closure then the shipper<br />
should be informed immediately.<br />
Page 72 ©ICHCA International Limited