ICHCA International <strong>Safe</strong>ty Panel Briefing Pamphlet No 30<br />

A6.2.2.2 The following steps should be taken when opening manway lids:<br />

Loosen the hand nuts on the swing<br />

bolts by rotating the hand nuts anticlockwise,<br />

keeping the swing bolts<br />

upright and located in their receiving<br />

bracket. Start with the hand nuts<br />

closet to the hinge and proceed in<br />

the order shown in Picture A6 5.<br />

Do not swing the swing bolts<br />

away from their receiving<br />

bracket.<br />

Wait for full evacuation <strong>of</strong> any<br />

residual pressure that might have remained into the tank.<br />

Pull the manway lid handle firmly upwards in order to release the<br />

gasket and then let it back.<br />

Complete the unscrewing <strong>of</strong> the swing bolts, then swing them away<br />

from their receiving bracket in the same order as shown in Picture<br />

A6.5<br />

Open the manway lid by rotating it around its horizontal spindle<br />

(hinge).<br />

A6.2.3 Closing the Manway Lids<br />

A6.2.3.1 The following steps should be taken when closing manway lids:<br />

Check the gasket and gasket receiving surface for cleanliness and<br />

remove any dirt or grit.<br />

Position the coverlid gasket in front <strong>of</strong> the neck ring sealing surface<br />

Close the manway lid<br />

Swing the swing bolts to the upright<br />

position and position them in their<br />

receiving bracket<br />

Rotate the hand nuts clockwise in<br />

order to tighten the swing bolts.<br />

Tighten in the order shown in Picture<br />

A6.6<br />

Lock-tighten the swing bolts with a<br />

torque <strong>of</strong> 3 m daN in order to ensure<br />

gasket tightness<br />

Note 1: It is recommended that a torque wrench be used to ensure that the<br />

correct torque is applied<br />

Note 2: Although a torque <strong>of</strong> 3 m daN should be necessary to ensure<br />

proper leak tightness, it is acceptable to apply a torque up to 10 m<br />

daN if required with no risk <strong>of</strong> damaging the swing bolts, manway<br />

lid and receiving brackets.<br />

Page 71 ©ICHCA International Limited<br />

5<br />

4<br />

3<br />

8<br />

1<br />

7<br />

2<br />

8<br />

Picture A6.5<br />

2<br />

6<br />

5<br />

1<br />

Picture A6.6<br />

4<br />

6<br />

3<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!